{"uid":"cap_zahVDIpVB24kSkgNnZ0Fy","slug":"mining-net-capital-requirement-distribution-summary-5dfb9272","name":"Mining Net Capital Requirement — Distribution Summary","description":"Mining net capital requirement — Distribution summary: Distribution summary for Mining net capital requirement. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded distribution summary report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-net-capital-summary?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["hardware_usd","installation_usd","rebates_usd"],"properties":{"rebates_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0},"hardware_usd":{"type":"number","default":30000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"installation_usd":{"type":"number","default":5000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},{"rebates_usd":1100,"hardware_usd":33000,"installation_usd":5500},{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},{"rebates_usd":1100,"hardware_usd":33000,"installation_usd":5500}],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_1MZgp0M98smxuI66d0gcW","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes a statistical distribution summary for mining net capital requirements given hardware, installation, and rebate cost inputs across multiple scenarios.","exampleAgentPrompt":"Can you run a distribution summary on mining net capital requirements for these four scenarios: hardware costs of $30,000, $33,000, $30,000, and $33,000, installation costs of $5,000, $5,500, $5,000, and $5,500, and rebates of $1,000, $1,100, $1,000, and $1,100 respectively?","exampleUseCases":[{"title":"Comparing mining rig capital variability","prompt":"I have six different mining rig configurations with hardware costs ranging from $25,000 to $50,000, installation costs between $4,000 and $8,000, and rebates from $500 to $2,000 — can you give me a distribution summary of the net capital requirements across all of them?"},{"title":"Budgeting for a mining farm expansion","prompt":"We're planning to expand our mining farm with 10 new units. Hardware per unit runs $35,000, installation is $6,000, and we get $1,200 in rebates each. Can you summarize the distribution of net capital requirements across all 10 scenarios?"},{"title":"Sensitivity analysis on rebate assumptions","prompt":"I want to see how sensitive net capital requirements are to rebate levels — run a distribution summary for 5 scenarios where hardware is $30,000 and installation is $5,000 each time, but rebates vary from $0 to $2,000 in $500 steps."}],"resultDescription":"Returns a bounded distribution summary report covering statistical metrics (such as mean, spread, and percentiles) for the net capital requirement computed from the supplied hardware, installation, and rebate cost inputs across the provided scenario rows. No live market prices or guaranteed returns are included; results are based solely on the supplied assumptions.","failureModes":["Fewer than 2 rows supplied — minimum 2 scenario rows are required","More than 200 rows supplied — exceeds maxItems limit","hardware_usd set to zero or negative — exclusiveMinimum requires value > 0","Non-numeric or missing required fields (hardware_usd, installation_usd, rebates_usd) cause validation errors","Payment failure or insufficient USDC balance results in 402 response with no report returned"],"whenToPreferThis":"Choose this endpoint when you need a statistical distribution summary — not just a single-point calculation — of mining net capital requirements across multiple hardware and cost scenarios. It is ideal for sensitivity analysis, scenario comparison, or budgeting workflows where understanding the spread and central tendency of capital requirements matters. Prefer it over single-row calculators when you have 2–200 distinct configurations to analyze at once.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:59.170Z","isFirstParty":false,"canonicalSlug":"mining-net-capital-requirement-distribution-summary-5dfb9272"}