{"uid":"cap_ydV9NBhtbPy6GBEEi6hDW","slug":"halowerk-buerowerk-meeting-deadline-token-register-snapshot-compare-3d4dd890","name":"HALOWERK buerowerk Meeting Deadline Token Register Snapshot Compare","description":"HALOWERK buerowerk — bezahlte Endpunkte nach x402. Preise in USDC auf Base Mainnet.","url":"https://buero.halowerk.com/v1/baumarkt/meeting/deadline-token-register/snapshot-compare?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"baseline":{"type":"object","required":["source","notes"],"properties":{"notes":{"type":"object","required":["summary","topics","decisions","action_items","open_questions"],"properties":{"topics":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30},"summary":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30,"minItems":1},"decisions":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30},"action_items":{"type":"array","items":{"type":"object","required":["text","quote","segment_index","owner","due_raw"],"properties":{"text":{"type":"string","maxLength":1000,"minLength":1},"owner":{"type":["string","null"],"maxLength":80},"quote":{"type":"string","maxLength":3000,"minLength":1},"due_raw":{"type":["string","null"],"maxLength":3000},"segment_index":{"type":"integer","minimum":0}}},"maxItems":30},"open_questions":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30}}},"source":{"type":"object","oneOf":[{"required":["segments"]},{"required":["transcript_package"]}],"required":[],"properties":{"segments":{"$ref":"#/$defs/mbdf0d3bb9b"},"transcript_package":{"$ref":"#/$defs/m81f20e3330"}},"additionalProperties":false}}},"segments":{"$ref":"#/$defs/mbdf0d3bb9b"},"transcript_package":{"$ref":"#/$defs/m81f20e3330"}}},"responseSchema":{"type":"json"},"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_dI1iKvJmiLw_J-oP_lgW4","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Compares a new meeting transcript/notes snapshot against a baseline to detect changes in topics, decisions, action items, deadlines, and open questions","exampleAgentPrompt":"Compare my original meeting notes from last Tuesday's sprint planning with the updated transcript I just got — same baseline notes with the summary, topics, decisions, action items owned by Sarah and Jake, and the new segments — and tell me what changed in terms of deadlines, owners, and any new open questions.","exampleUseCases":[{"title":"Detecting deadline changes after meeting revision","prompt":"I have the baseline notes from our project kickoff meeting — summary, topics, decisions, and action items with owners and due dates — plus the new transcript segments from the follow-up. Can you compare them and tell me which deadlines or owners changed?"},{"title":"Tracking new action items in follow-up meeting","prompt":"Here are the original meeting notes with all the action items and open questions from last week, and here's the new transcript from today's follow-up. What new action items or decisions got added that weren't in the baseline?"},{"title":"Auditing topic drift between two meeting versions","prompt":"I need to know if the topics and decisions from our Q3 planning baseline still match what came out of the revised meeting transcript we received — can you snapshot-compare them and highlight what drifted or was dropped?"}],"resultDescription":"A JSON object containing a comparison between the baseline meeting notes and the new transcript/segments, highlighting changes in topics, decisions, action items (including owner and deadline changes), summary drift, and open questions that were added, removed, or modified.","failureModes":["Missing required 'summary' field in baseline notes returns validation error","Baseline source must include either 'segments' or 'transcript_package' but not neither — omitting both returns schema error","Action items missing required fields (text, quote, segment_index, owner, due_raw) cause request rejection","Exceeding maxItems (30) on any array field results in validation failure","Payment not provided or insufficient USDC triggers x402 payment required response","Malformed segment references cause comparison to fail silently or return partial results"],"whenToPreferThis":"Choose this endpoint when you need to programmatically diff two versions of a structured meeting record — especially when tracking changes to action items, deadlines, owners, decisions, or open questions between an original baseline and a new transcript. Prefer it over generic text-diff tools when you need structured, meeting-aware change detection that understands the schema of meeting notes (topics, decisions, action items with owners and due dates).","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-18T00:47:04.772Z","isFirstParty":false,"canonicalSlug":"halowerk-buerowerk-meeting-deadline-token-register-snapshot-compare-3d4dd890"}