{"uid":"cap_w0_4KbFuC5HAVz_CifsGD","slug":"brainiac-prevailing-wage-conformance-draft-generator-c44e5712","name":"BRAINIAC Prevailing Wage Conformance Draft Generator","description":"Pay-per-call APIs for AI agents: OFAC sanctions screening, compliance checks, token security, and Base chain data via x402. No account. Fixed USDC price. MCP-ready.","url":"https://www.brainiac.software/api/v1/prevailing-wage/conformance-draft?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"wdId":{"type":"string","maxLength":120,"minLength":1},"duties":{"type":"string","maxLength":4000,"minLength":1},"rationale":{"type":"string","maxLength":4000},"projectName":{"type":"string","maxLength":240,"minLength":1},"proposedRate":{"type":"number","minimum":0},"proposedClassification":{"type":"string","maxLength":120}}},"responseSchema":{"type":"json","example":{"draft":"DRAFT - SF-1444 classification conformance request\nProject: Example project\nWage determination: TX20260001\nWork duties: Install electrical conduit and wiring\nProposed classification: Electrician\nProposed rate: $31.50/hour\nRationale: Work duties are not listed in the determination.\nSubmit to the contracting officer for review. This draft is not an approved classification or rate.","submitted":false}},"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_KA6sAyks4XZJqzYlQkORx","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a draft SF-1444 classification conformance request for prevailing wage determinations on government contracts","exampleAgentPrompt":"Draft an SF-1444 conformance request for my project 'Highway 45 Expansion' under wage determination TX20260001 — the worker installs electrical conduit and wiring, I want to classify them as an Electrician at $31.50/hour, and my rationale is that this classification is not listed in the determination.","exampleUseCases":[{"title":"Electrician classification on federal highway project","prompt":"Draft a prevailing wage conformance request for my project 'Highway 45 Bridge Repair' under wage determination TX20260001. The worker installs electrical conduit and wiring, I'm proposing the Electrician classification at $31.50/hour, and my rationale is that this classification doesn't appear in the wage determination."},{"title":"New trade classification for federal building renovation","prompt":"I need an SF-1444 draft for our project 'Federal Building Renovation DC-2026' under wage determination DC20260015. The duties involve installing HVAC ductwork and mechanical systems, I'm proposing the Sheet Metal Worker classification at $42.00/hour, because this trade isn't listed in the determination."},{"title":"Specialty painter classification for military base project","prompt":"Can you generate a conformance draft for the 'Fort Bragg Barracks Upgrade' project, wage determination NC20260008? The worker applies industrial epoxy coatings and protective finishes, I want to classify them as an Industrial Painter at $28.75/hour — the rationale is that standard painter rates in the determination don't cover industrial coating work."}],"resultDescription":"Returns a plain-text draft of an SF-1444 classification conformance request including the project name, wage determination ID, described work duties, proposed classification, proposed hourly rate, rationale, and a note to submit to the contracting officer. Also includes a 'submitted' boolean field (always false, as this is a draft only, not a formal submission).","failureModes":["Missing required fields (wdId, duties, projectName) will result in a validation error","Proposed rate below minimum wage threshold may trigger a validation error","Overly long duties or rationale strings exceeding 4000 characters will be rejected","Malformed JSON body returns a 400 error","Payment failure via x402 protocol results in no response"],"whenToPreferThis":"Use this endpoint when you need to produce a structured, properly formatted SF-1444 draft conformance request for a government contract prevailing wage situation where a worker's job classification is not listed in the existing wage determination. It is purpose-built for Davis-Bacon / Service Contract Act compliance workflows and saves time over manually drafting the document from scratch.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-11-15T06:38:29.650Z","isFirstParty":false,"canonicalSlug":"brainiac-prevailing-wage-conformance-draft-generator-c44e5712"}