{"uid":"cap_uQmKeh2i7aPG6nfZ4ZW7F","slug":"mesh-budgets-numeric-distribution-adjacent-row-changes-033a7b6c","name":"Mesh Budgets — Numeric Distribution + Adjacent Row Changes","description":"Mesh budgets — Numeric distribution + Adjacent row changes: Numeric distribution + Adjacent row changes for supplied mesh budgets records (triangle_count, vertex_count). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-creative-01-077?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["row_id","asset_group","date","triangle_count","vertex_count"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"asset_group":{"type":"string","default":"","maxLength":80},"vertex_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"triangle_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","asset_group":"group-a","vertex_count":1,"triangle_count":10},{"date":"2026-10-02","row_id":"row-2","asset_group":"group-b","vertex_count":2,"triangle_count":20},{"date":"2026-10-03","row_id":"row-3","asset_group":"group-a","vertex_count":3,"triangle_count":15},{"date":"2026-10-04","row_id":"row-4","asset_group":"group-b","vertex_count":4,"triangle_count":30}],"maxItems":200,"minItems":1},"field":{"enum":["triangle_count","vertex_count"],"type":"string","default":"triangle_count"}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_iRQ-AUBCgIkb5UYzwgGNb","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Analyzes supplied mesh budget records (triangle_count, vertex_count) to produce a numeric distribution report and an adjacent row change series for up to 200 rows.","exampleAgentPrompt":"Can you run a numeric distribution and adjacent row change analysis on these mesh budget records — I have triangle_count and vertex_count for each asset group by date, and I want to analyze the triangle_count field across up to 200 rows?","exampleUseCases":[{"title":"3D asset complexity audit","prompt":"I have a list of 150 mesh records with triangle_count and vertex_count for different asset groups across October — can you give me a numeric distribution and show how the triangle_count changes between adjacent rows?"},{"title":"Game engine mesh budget review","prompt":"We track mesh budgets by date and asset group. Run a distribution analysis and adjacent row change report on our vertex_count values so I can see how vertex counts are spread and where big jumps happen."},{"title":"Animation pipeline polygon tracking","prompt":"I've got mesh budget data for our animation assets — each row has a row_id, asset_group, date, triangle_count, and vertex_count. Analyze the triangle_count field and give me both a numeric distribution and the sequential row-to-row changes."}],"resultDescription":"Returns two analytical reports for the chosen field (triangle_count or vertex_count): (1) a numeric distribution breakdown showing how values are spread across the supplied rows, and (2) an adjacent row change series showing the delta between consecutive rows — both computed locally from the supplied data without any external lookup.","failureModes":["Missing required fields (row_id, date, asset_group) cause validation errors","Supplying more than 200 rows exceeds the maxItems limit","Invalid date format (not YYYY-MM-DD) fails pattern validation","Numeric values outside ±1,000,000,000,000 are rejected","Empty rows array returns an error","Invalid field enum value other than triangle_count or vertex_count is rejected"],"whenToPreferThis":"Choose this endpoint when you have up to 200 mesh budget records with triangle_count or vertex_count fields and need both a distribution summary and a sequential row change analysis in a single call at low cost ($0.01 USDC). Ideal for 3D asset pipelines, game development budget reviews, or any workflow tracking polygon/vertex counts across dates and asset groups. Not suitable if you need live data lookups, predictions, or analysis of more than 200 rows at once.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-26T06:56:23.203Z","isFirstParty":false,"canonicalSlug":"mesh-budgets-numeric-distribution-adjacent-row-changes-033a7b6c"}