{"uid":"cap_tNsrRDa-zK94O5Dq60Qd1","slug":"mesh-budgets-daily-sum-series-and-base-100-series-analyzer-a8f7489c","name":"Mesh Budgets Daily Sum Series and Base-100 Series Analyzer","description":"Mesh budgets — Daily sum series + Base-100 series: Daily sum series + Base-100 series for supplied mesh budgets records (triangle_count, vertex_count). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-creative-01-138?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["row_id","asset_group","date","triangle_count","vertex_count"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"asset_group":{"type":"string","default":"","maxLength":80},"vertex_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"triangle_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","asset_group":"group-a","vertex_count":1,"triangle_count":10},{"date":"2026-10-02","row_id":"row-2","asset_group":"group-b","vertex_count":2,"triangle_count":20},{"date":"2026-10-03","row_id":"row-3","asset_group":"group-a","vertex_count":3,"triangle_count":15},{"date":"2026-10-04","row_id":"row-4","asset_group":"group-b","vertex_count":4,"triangle_count":30}],"maxItems":200,"minItems":1},"field":{"enum":["triangle_count","vertex_count"],"type":"string","default":"triangle_count"},"base_index":{"type":"integer","default":0,"maximum":199,"minimum":0}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_DUfXvfSjGCBgd_a0Tmjo8","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes daily sum time series and base-100 indexed series for mesh budget data (triangle_count or vertex_count) across up to 200 rows, returning two analytical reports.","exampleAgentPrompt":"Take my mesh budget records for the last quarter — each row has a date, asset_group, triangle_count, and vertex_count — and give me both a daily sum series and a base-100 indexed series for triangle_count, starting the index from row 0.","exampleUseCases":[{"title":"Game asset complexity trend tracking","prompt":"I have 150 rows of mesh data from our game's asset pipeline, each with a date, asset_group, triangle_count, and vertex_count. Can you give me a daily sum series and a base-100 series for triangle_count, indexed from row 0, so I can see how polygon budgets are growing over time?"},{"title":"3D model vertex budget review by group","prompt":"Here's my mesh budget export — dates, asset groups, and vertex counts for about 80 assets over the past two months. Run both a daily sum series and a base-100 index series on vertex_count starting from index 0 so we can spot which days spiked above baseline."},{"title":"Animation rig mesh audit over a sprint","prompt":"I've got a two-week sprint's worth of mesh records across three asset groups — each entry has a date, row ID, triangle_count, and vertex_count. Please compute the daily totals and a base-100 growth index for triangle_count with base_index at 0 so I can report on mesh complexity trends to the art director."}],"resultDescription":"Returns two analytical reports: (1) a daily sum series aggregating the selected field (triangle_count or vertex_count) by date, and (2) a base-100 indexed series normalizing values relative to the specified base row index, covering up to 200 input rows.","failureModes":["More than 200 rows submitted — request rejected, must split into batches","Missing required fields (row_id, date, asset_group, triangle_count, vertex_count) — validation error","Invalid date format (must match YYYY-MM-DD) — schema validation failure","base_index out of range (must be 0–199) — error response","All values null for the selected field — empty or degenerate series output","Payment not attached or insufficient — x402 payment required error"],"whenToPreferThis":"Choose this endpoint when you have structured mesh budget data (triangle and vertex counts) with dates and asset groups and need both daily aggregation and base-100 normalization in a single call. It is purpose-built for 3D asset pipeline analytics and returns two complementary reports for the price of one. Prefer it over generic analytics tools when your data fits the mesh budget schema and you want no-setup, supply-your-own-data computation without external data fetching or live lookups.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-17T12:42:49.794Z","isFirstParty":false,"canonicalSlug":"mesh-budgets-daily-sum-series-and-base-100-series-analyzer-a8f7489c"}