{"uid":"cap_sNXfojZG50qdsDRI6_C6G","slug":"proposal-preparation-record-quality-audit-and-numeric-row-ordering-f1d3fa2e","name":"Proposal Preparation Record Quality Audit and Numeric Row Ordering","description":"Proposal preparation — Record quality audit + Numeric row ordering: Record quality audit + Numeric row ordering for supplied proposal preparation records (completed_sections, planned_sections). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-writing-08-007?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["row_id","document_group","date","completed_sections","planned_sections"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"document_group":{"type":"string","default":"","maxLength":80},"planned_sections":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"completed_sections":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","document_group":"group-a","planned_sections":1,"completed_sections":10},{"date":"2026-10-02","row_id":"row-2","document_group":"group-b","planned_sections":2,"completed_sections":20},{"date":"2026-10-03","row_id":"row-3","document_group":"group-a","planned_sections":3,"completed_sections":15},{"date":"2026-10-04","row_id":"row-4","document_group":"group-b","planned_sections":4,"completed_sections":30}],"maxItems":200,"minItems":1},"field":{"enum":["completed_sections","planned_sections"],"type":"string","default":"completed_sections"}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_vmMjY_FplbwDVl1wn69Xx","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Runs two independent analytical reports on proposal preparation data: a record quality audit and numeric row ordering of completed_sections or planned_sections values, for up to 200 rows.","exampleAgentPrompt":"Can you run a record quality audit and numeric row ordering on my proposal preparation data? I have rows with row_id, document_group, date, completed_sections, and planned_sections — I want both reports on the completed_sections field for up to 200 records.","exampleUseCases":[{"title":"Proposal section completion quality check","prompt":"I have a batch of proposal tracking records with completed_sections and planned_sections counts per document group — can you audit them for data quality issues and order the rows by completed_sections so I can see which proposals are furthest along?"},{"title":"Pre-submission proposal data validation","prompt":"Before I submit my proposal dataset, can you run a record quality audit on these rows and give me a numeric ordering by planned_sections? I want to catch any bad or missing values before we finalize things."},{"title":"Document group progress ranking","prompt":"I've got about 150 proposal preparation records across several document groups with dates between 2026-10-01 and 2026-10-31 — please do a quality audit on them and rank the rows numerically by planned_sections so I can prioritize review."}],"resultDescription":"Two independent analytical reports: (1) a record quality audit flagging issues such as nulls, out-of-range values, or malformed entries in the proposal data rows; and (2) a numeric row ordering ranking each row by the selected field (completed_sections or planned_sections). Both reports cover the same batch of up to 200 supplied rows.","failureModes":["Input array exceeds 200 rows — request rejected","Missing required fields (row_id, date, completed_sections, planned_sections) — validation error","Date field does not match YYYY-MM-DD pattern — schema rejection","Invalid field selector (not 'completed_sections' or 'planned_sections') — enum validation error","Empty rows array — minItems constraint violation","Payment of 0.01 USDC not received — x402 payment required response"],"whenToPreferThis":"Choose this endpoint when you have up to 200 proposal preparation records and need both a data quality audit and a numeric ordering of rows by section counts in a single low-cost call. It is best suited for offline batch analysis of proposal tracking data where no live lookups, predictions, or external actions are needed. Prefer it over general-purpose data tools when you want two co-packaged reports (quality + ordering) on the specific completed_sections and planned_sections fields.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-25T12:33:43.254Z","isFirstParty":false,"canonicalSlug":"proposal-preparation-record-quality-audit-and-numeric-row-ordering-f1d3fa2e"}