{"uid":"cap_r4a_Rkpt5ZQB42M2CaNUT","slug":"halowerk-land-dossiers-solar-farm-land-cover-first-screening-9d241789","name":"HALOWERK Land Dossiers – Solar Farm Land-Cover-First Screening","description":"Decision-support dossier for solar farm screening using six disclosed measurements and a deterministic land-cover-priority evidence score. It is screening evidence, not a permit, valuation or legal determination.","url":"https://landdossier.halowerk.com/v1/dossier-solar-farm-landcover-first","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"latitude":{"type":"number","maximum":72.5,"minimum":34,"description":"WGS84 latitude inside the published European coverage."},"radius_m":{"type":"integer","default":250,"maximum":2000,"minimum":50},"longitude":{"type":"number","maximum":40.5,"minimum":-31.5,"description":"WGS84 longitude inside the published European coverage."}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.012","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.012/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.012","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.012","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_eND6aVaFenk24y-sdi54h","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.012","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Returns a deterministic land-cover-priority evidence score and six supporting measurements to help screen a European location for solar farm suitability.","exampleAgentPrompt":"Can you run a solar farm land-cover screening dossier for the site at 48.8566°N, 2.3522°E using a 500-metre radius and tell me if the land cover looks favourable?","exampleUseCases":[{"title":"Pre-feasibility solar site shortlist","prompt":"I have three candidate sites in Spain for a solar farm — can you screen the one at 40.4168°N, 3.7038°W with a 1000-metre radius and give me the land-cover priority score so I can compare it against the others?"},{"title":"Automated portfolio screening for solar pipeline","prompt":"Run a land-cover-first solar farm screening dossier for the plot centred at 51.5074°N, 0.1278°W with a 250-metre radius — I need the six measurements and the evidence score for my site pipeline report."},{"title":"Ruling out unsuitable land for solar development","prompt":"Before we commission a full survey, can you check whether the land around 47.3769°N, 8.5417°E within 750 metres scores well enough on land cover for a solar farm to be worth pursuing further?"}],"resultDescription":"A structured screening dossier containing a deterministic land-cover-priority evidence score plus six disclosed land measurements for the specified European location and radius. The result is decision-support evidence for early-stage solar farm site screening — not a permit, valuation, or legal determination.","failureModes":["Coordinates outside European coverage bounds (lat 34–72.5°N, lon −31.5–40.5°E) will return an error","radius_m below 50 or above 2000 will be rejected as out of range","Missing latitude or longitude fields will cause a validation error","Payment failure via x402 protocol will block the call","Server-side land-cover data gaps for very remote or sparse regions may reduce result quality"],"whenToPreferThis":"Choose this endpoint when you need a fast, low-cost, deterministic land-cover-priority screen for a specific European location before committing to expensive ground surveys or full feasibility studies. It is purpose-built for solar farm screening (not housing, hotels, or offices — use sibling endpoints for those). Prefer it when you need reproducible, evidence-based scoring at scale across many candidate coordinates within the European coverage area.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-09-15T12:47:01.707Z","isFirstParty":false}