{"uid":"cap_lqWTXGra_Lh9_RaUkwU9Y","slug":"mesh-budgets-adjacent-row-changes-two-measure-correlation-098b07dd","name":"Mesh Budgets — Adjacent Row Changes + Two-Measure Correlation","description":"Mesh budgets — Adjacent row changes + Two-measure correlation: Adjacent row changes + Two-measure correlation for supplied mesh budgets records (triangle_count, vertex_count). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-creative-01-158?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["row_id","asset_group","date","triangle_count","vertex_count"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"asset_group":{"type":"string","default":"","maxLength":80},"vertex_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"triangle_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","asset_group":"group-a","vertex_count":1,"triangle_count":10},{"date":"2026-10-02","row_id":"row-2","asset_group":"group-b","vertex_count":2,"triangle_count":20},{"date":"2026-10-03","row_id":"row-3","asset_group":"group-a","vertex_count":3,"triangle_count":15},{"date":"2026-10-04","row_id":"row-4","asset_group":"group-b","vertex_count":4,"triangle_count":30}],"maxItems":200,"minItems":1},"field":{"enum":["triangle_count","vertex_count"],"type":"string","default":"triangle_count"}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_ccmBGJDnLiH_0W_ZBz89f","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes adjacent row changes and two-measure correlation analysis on mesh budget records (triangle_count and vertex_count) for up to 200 supplied rows.","exampleAgentPrompt":"Can you run adjacent row change detection and a two-measure correlation on my mesh budget data — here are up to 200 rows with triangle_count and vertex_count per asset group, and I want the analysis on triangle_count specifically?","exampleUseCases":[{"title":"3D asset complexity trend tracking","prompt":"I have daily mesh budget records for my game assets across two groups — can you analyze the row-over-row changes in triangle_count and also check whether triangle_count and vertex_count are correlated across these 200 rows?"},{"title":"Animation pipeline mesh audit","prompt":"My team exported mesh budget data for our animation pipeline covering October — can you run adjacent row change analysis and a two-measure correlation on the triangle_count and vertex_count columns so I can see where complexity is spiking?"},{"title":"Budget optimization for real-time scenes","prompt":"We're trying to optimize mesh budgets for our real-time renderer. Can you take these records with triangle_count and vertex_count per asset group and date, and give me the sequential change report plus a correlation between the two measures?"}],"resultDescription":"Returns two analytical reports: (1) an adjacent row changes report showing the sequential differences in the selected measure (triangle_count or vertex_count) across up to 200 rows, and (2) a two-measure correlation report quantifying the statistical relationship between triangle_count and vertex_count in the supplied dataset.","failureModes":["Rows exceeding 200 items will be rejected or truncated","Missing required fields (row_id, date, asset_group, triangle_count, vertex_count) will cause validation errors","Malformed date strings not matching YYYY-MM-DD pattern will fail schema validation","Null values in both measure fields may produce undefined correlation results","Empty rows array will return an error"],"whenToPreferThis":"Choose this endpoint when you have pre-collected mesh budget records with triangle and vertex counts and need both sequential row-change analysis and inter-measure correlation in a single call, without requiring any external data lookup or prediction. Ideal for 3D asset pipeline audits, budget reviews, or optimization workflows where the data is already on hand.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-17T12:42:54.211Z","isFirstParty":false,"canonicalSlug":"mesh-budgets-adjacent-row-changes-two-measure-correlation-098b07dd"}