{"uid":"cap_iHrVtA9s5RmI7ClZgnDba","slug":"assembly-schedule-comparison-0b0449d9","name":"Assembly Schedule Comparison","description":"Simulate up to 10 sequential assembly scenarios of 100 identical units using one shared crane and declared crews. Factory releases, lift and connection durations are explicit. No lift-capacity, structural, site-safety or optimized scheduling approval. New modular adapter: retained result recovery for 24 hours, minimal receipt metadata for 90 days. Existing live route unchanged.","url":"https://www.mahastrategies.com/api/v1/compute/manufacturing/schedule-comparison?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"dataClass":{"enum":["public","synthetic"],"type":"string"},"scenarios":{"type":"array","maxItems":10,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.150001","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.150001/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.150001","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.150001","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_101GP19RAhEPhC6zGur--","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.150001","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Simulates up to 10 sequential assembly scenarios for 100 identical units using one shared crane and declared crews, comparing factory release, lift, and connection durations across scenarios.","exampleAgentPrompt":"Run a schedule comparison for 3 assembly scenarios using public data — each scenario has 100 identical units sharing one crane, with crew sizes of 4, 6, and 8 respectively, factory release of 2 hours per unit, a lift duration of 30 minutes, and a connection duration of 45 minutes per unit.","exampleUseCases":[{"title":"Crew size impact on assembly timeline","prompt":"Can you simulate 4 assembly scenarios comparing how different crew sizes — 2, 4, 6, and 8 workers — affect the total schedule for 100 identical modular units sharing one crane, with a 1-hour factory release, 20-minute lift, and 35-minute connection duration? Use synthetic data."},{"title":"Lift duration sensitivity analysis","prompt":"I want to compare 5 assembly scenarios where lift duration varies from 15 to 45 minutes in 10-minute increments, all using one crane, a fixed crew of 5, 100 units, 90-minute factory release, and 30-minute connection time — use public data class."},{"title":"Factory release schedule optimization","prompt":"Run 3 sequential assembly scenarios for me where the factory release intervals differ — 30 minutes, 60 minutes, and 90 minutes — with 100 identical units, a single crane, crew of 6, 25-minute lift duration, and 40-minute connection duration, using synthetic data."}],"resultDescription":"Returns a structured comparison of up to 10 simulated assembly scenarios, including computed schedule timelines for 100 units under one shared crane and declared crew configurations, with explicit lift and connection durations. Results are retained for 24 hours; receipt metadata is retained for 90 days.","failureModes":["Invalid or missing scenarios array (must have 1–10 items)","Unsupported dataClass value outside 'public' or 'synthetic' enum","Missing required scenario fields such as crew size, lift or connection durations","Exceeding 10 scenarios per request","Payment failure or insufficient USDC balance via x402 protocol","Service timeout for large or complex scenario batches"],"whenToPreferThis":"Choose this endpoint when you need to quickly compare multiple sequential assembly schedules for a fixed batch of identical units constrained to one crane, particularly in modular or prefabricated construction planning contexts. It is best suited for scenario analysis where explicit lift and connection durations are known and crew configurations vary across scenarios. It does not perform structural, safety, or optimized scheduling approvals, so it should not be used as a substitute for engineering sign-off.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-21T18:53:47.967Z","isFirstParty":false,"canonicalSlug":"assembly-schedule-comparison-0b0449d9"}