{"uid":"cap_hM-HC_dL9UJmqt7l95AiG","slug":"mining-fleet-power-two-input-scenario-grid-e5e904d7","name":"Mining Fleet Power — Two-Input Scenario Grid","description":"Mining fleet power — Two-input scenario grid: Two-input scenario grid for Mining fleet power. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded two-input scenario grid report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-fleet-kw-stress-grid?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"field_x":{"enum":["units","watts_each"],"type":"string","default":"units"},"field_y":{"enum":["units","watts_each"],"type":"string","default":"watts_each"},"baseline":{"type":"object","default":{"units":10,"watts_each":3000},"required":["units","watts_each"],"properties":{"units":{"type":"number","default":10,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"watts_each":{"type":"number","default":3000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"values_x":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[10,11],"maxItems":10,"minItems":1},"values_y":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[3000,3300.0000000000005],"maxItems":10,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_dUR_5HJc6jSWdNRBToY7h","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a two-input scenario grid for mining fleet total power consumption given varying unit counts and per-unit wattage assumptions.","exampleAgentPrompt":"Run a two-input scenario grid for my mining fleet power: use units as the X axis with values [10, 50, 100, 500] and watts_each as the Y axis with values [3000, 3300, 3600], starting from a baseline of 10 units at 3000 watts each.","exampleUseCases":[{"title":"Scaling fleet size sensitivity analysis","prompt":"I'm planning to grow my mining operation and want to see how total power consumption changes as I scale from 10 to 1000 units — can you run a scenario grid with units on one axis (10, 100, 500, 1000) and watts_each on the other (3000, 3300, 3600), using a baseline of 10 units at 3000W each?"},{"title":"Hardware upgrade power impact grid","prompt":"We're evaluating three different ASIC models with wattages of 2500W, 3000W, and 3500W and want to stress-test our fleet of 50, 100, and 200 units — generate the two-input power scenario grid with watts_each on the Y axis and units on the X axis, baseline 50 units at 3000W."},{"title":"Energy budget planning for mining site","prompt":"Our data center is planning its electrical capacity and I need to model worst-case and best-case power scenarios — run a mining fleet power grid with units varying across [20, 40, 80] and watts_each across [2800, 3000, 3200, 3500], baseline 20 units at 2800 watts each."}],"resultDescription":"Returns a bounded two-input scenario grid report showing computed total fleet power values across all combinations of the specified X-axis and Y-axis input values, based on the supplied mining unit count and per-unit wattage assumptions. No live pricing, profitability, or guaranteed return data is included — only formula-derived power figures with disclosed units.","failureModes":["Invalid field_x or field_y enum value (must be 'units' or 'watts_each')","values_x or values_y arrays exceed 10 items — request rejected","Baseline missing required fields (units or watts_each)","Zero or negative values for units or watts_each violate exclusiveMinimum constraint","Payment not included or insufficient (requires 0.01 USDC via x402 protocol)","Both field_x and field_y set to the same variable, producing a degenerate grid"],"whenToPreferThis":"Choose this endpoint when you need a structured two-dimensional sensitivity table for mining fleet electricity consumption — specifically when you want to vary both the number of mining units and per-unit wattage simultaneously and see all output combinations in a grid format. Prefer this over a single-calculation endpoint when performing scenario planning, hardware comparison, or capacity budgeting across multiple parameter combinations in one call.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-16T00:54:03.894Z","isFirstParty":false,"canonicalSlug":"mining-fleet-power-two-input-scenario-grid-e5e904d7"}