{"uid":"cap_gyoBWqB2NA2H8fVyOo9Pj","slug":"mining-net-capital-requirement-adjacent-period-changes-60b74f19","name":"Mining Net Capital Requirement — Adjacent Period Changes","description":"Mining net capital requirement — Adjacent period changes: Adjacent period changes for Mining net capital requirement. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded adjacent period changes report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-net-capital-period-changes?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["hardware_usd","installation_usd","rebates_usd"],"properties":{"rebates_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0},"hardware_usd":{"type":"number","default":30000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"installation_usd":{"type":"number","default":5000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},{"rebates_usd":1100,"hardware_usd":33000,"installation_usd":5500},{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},{"rebates_usd":1100,"hardware_usd":33000,"installation_usd":5500}],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_SL2U1HGNqRkJTqHgyheFy","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes adjacent period changes in mining net capital requirements given hardware, installation, and rebate costs across multiple time periods.","exampleAgentPrompt":"Calculate the adjacent period changes in mining net capital requirements using these two periods: Period 1 has $30,000 hardware, $5,000 installation, and $1,000 in rebates; Period 2 has $33,000 hardware, $5,500 installation, and $1,100 in rebates.","exampleUseCases":[{"title":"Quarterly mining capex delta tracking","prompt":"I want to see how my mining net capital requirement changed between Q1 and Q2 — Q1 had $50,000 in hardware, $8,000 installation, and $2,000 rebates; Q2 had $60,000 hardware, $9,500 installation, and $1,800 rebates. Give me the adjacent period changes report."},{"title":"Evaluating equipment upgrade cost impact","prompt":"I'm comparing my old mining setup against a new upgraded one. Old setup: $30,000 hardware, $5,000 installation, $1,000 rebates. New setup: $45,000 hardware, $7,000 installation, $500 rebates. Can you show me the net capital requirement change between these two periods?"},{"title":"Multi-period mining investment analysis","prompt":"I have four consecutive periods of mining capital data and need to see how the net capital requirement shifted between each adjacent pair. Here are the costs — Period 1: $28,000 hardware, $4,500 install, $900 rebates; Period 2: $31,000 hardware, $5,000 install, $1,100 rebates; Period 3: $35,000 hardware, $5,500 install, $1,200 rebates; Period 4: $34,000 hardware, $5,300 install, $1,150 rebates."}],"resultDescription":"A bounded report showing the adjacent period-over-period changes in mining net capital requirements, derived from the supplied hardware, installation, and rebate cost inputs. Includes computed deltas between consecutive rows using a disclosed formula with stated units, but no live pricing or guaranteed returns.","failureModes":["Fewer than 2 rows provided — minimum of 2 periods required for adjacent comparison","Hardware cost of 0 or negative — exclusiveMinimum enforces >0","Input values exceeding the maximum allowed (1e16 USD) cause validation errors","More than 200 rows submitted — maxItems limit exceeded","Missing required fields (hardware_usd, installation_usd, rebates_usd) in any row","Payment failure for 0.01 USDC via x402 protocol"],"whenToPreferThis":"Choose this endpoint when you need a structured, period-over-period delta report for mining net capital requirements based on user-supplied hardware, installation, and rebate assumptions. It is purpose-built for this specific mining capital metric and returns a bounded, formula-disclosed report — ideal for financial planning, audit trails, or comparative analysis across consecutive operational periods without needing live market prices.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-16T00:52:59.486Z","isFirstParty":false,"canonicalSlug":"mining-net-capital-requirement-adjacent-period-changes-60b74f19"}