{"uid":"cap_ePJSBT7V1ujq0KY4-3DMo","slug":"mining-power-capacity-headroom-record-ranking-f15bccf9","name":"Mining Power Capacity Headroom — Record Ranking","description":"Mining power capacity headroom — Record ranking: Record ranking for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded record ranking report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-rank?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"capacity_kw":100,"committed_kw":70},{"capacity_kw":110.00000000000001,"committed_kw":77},{"capacity_kw":100,"committed_kw":70},{"capacity_kw":110.00000000000001,"committed_kw":77}],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_w2Vl5AMGIn5twB7cgowoZ","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Ranks multiple mining facility records by available power capacity headroom (capacity minus committed power), given user-supplied capacity and committed kilowatt values.","exampleAgentPrompt":"Rank these four mining sites by available power headroom: Site A has 500 kW capacity with 350 kW committed, Site B has 800 kW capacity with 400 kW committed, Site C has 200 kW capacity with 190 kW committed, and Site D has 1000 kW capacity with 700 kW committed.","exampleUseCases":[{"title":"Prioritize expansion at least-utilized site","prompt":"I have three mining facilities — one with 600 kW capacity and 420 kW committed, one with 1000 kW capacity and 500 kW committed, and one with 300 kW capacity and 280 kW committed. Rank them by how much power headroom each has so I know where I have room to add more rigs."},{"title":"Compare power slack across leased mining slots","prompt":"I'm leasing five mining slots with these capacity and committed power figures: 150 kW / 90 kW, 200 kW / 195 kW, 500 kW / 250 kW, 75 kW / 30 kW, and 400 kW / 380 kW. Can you rank them from most to least available power headroom?"},{"title":"Identify bottlenecked sites before adding hardware","prompt":"Before I order new ASIC miners, rank these six sites by remaining power capacity headroom — Site 1: 2000 kW / 1800 kW, Site 2: 1500 kW / 900 kW, Site 3: 800 kW / 750 kW, Site 4: 3000 kW / 1000 kW, Site 5: 600 kW / 590 kW, Site 6: 1200 kW / 600 kW."}],"resultDescription":"A bounded ranking report listing the submitted mining records ordered by their computed power capacity headroom (capacity_kw minus committed_kw), using supplied assumptions only. The report discloses the formula and units used. No live prices, actual mining performance, or guaranteed returns are included.","failureModes":["Fewer than 2 rows provided — minimum row count not met","capacity_kw set to 0 or negative — exclusiveMinimum violation","More than 200 rows submitted — exceeds maxItems limit","committed_kw exceeds capacity_kw — may produce zero or negative headroom values but is technically valid","Payment not processed — x402 payment required before response is returned","Malformed row objects missing required fields capacity_kw or committed_kw"],"whenToPreferThis":"Choose this endpoint when you need a ranked comparison of multiple mining records specifically by available power capacity headroom, using your own supplied capacity and committed-power figures. It is purpose-built for mining power infrastructure analysis with a disclosed formula, making it preferable to generic computation tools when you need an auditable, bounded ranking report tied to mining domain assumptions.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-16T18:47:34.292Z","isFirstParty":false,"canonicalSlug":"mining-power-capacity-headroom-record-ranking-f15bccf9"}