{"uid":"cap_cYc8guTm6ueED6VpHYj4q","slug":"mining-facility-overhead-energy-pue-before-and-after-comparison-144f21b6","name":"Mining Facility Overhead Energy PUE Before-and-After Comparison","description":"Mining facility overhead energy — Before and after comparison: Before and after comparison for Mining facility overhead energy. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded before and after comparison report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-pue-overhead-compare?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"after":{"type":"object","default":{"pue":1.32,"it_kwh":792.0000000000001},"required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"before":{"type":"object","default":{"pue":1.2,"it_kwh":720},"required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_2fun5nyP2ufWJqkQNimuv","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes and compares total facility energy consumption before and after a PUE change for a mining operation, returning a bounded overhead energy comparison report.","exampleAgentPrompt":"Compare my mining facility's energy overhead before and after a PUE improvement — before it was PUE 1.4 consuming 800 kWh of IT load, and after the upgrade it'll be PUE 1.2 with 800 kWh IT load. What's the difference in total facility energy?","exampleUseCases":[{"title":"Cooling upgrade energy savings estimate","prompt":"My mining farm currently runs at PUE 1.45 with 5000 kWh of IT load. After installing new liquid cooling I expect PUE to drop to 1.15. Can you run a before-and-after comparison to show how much overhead energy I'd save?"},{"title":"New mining hardware IT load change","prompt":"I'm adding more ASIC miners which will bring my IT load from 1200 kWh up to 1800 kWh, while my PUE stays at 1.3. Show me the before and after comparison for total facility energy consumption."},{"title":"Evaluating facility efficiency for investor report","prompt":"For our investor deck I need a formal before-and-after energy comparison: our old setup was PUE 1.6 at 2400 kWh IT load, and our upgraded facility is now PUE 1.25 at 2400 kWh. Can you generate that comparison report?"}],"resultDescription":"A bounded before-and-after comparison report containing total facility energy consumption for both scenarios (IT kWh × PUE), the overhead energy in each state, and the delta between them. Formulas and units are disclosed. No live prices, mining revenue, or guaranteed returns are included.","failureModes":["PUE value below 1 or above 10 returns validation error","IT kWh of 0 or negative returns exclusiveMinimum validation error","Missing required fields (it_kwh or pue) in either before or after objects causes request rejection","Extremely large IT kWh values (approaching upper bound) may produce unexpected large numbers but are technically valid","Payment of 0.01 USDC required per call; failure to pay returns 402 response"],"whenToPreferThis":"Choose this endpoint when you need a quick, structured computation comparing total mining facility energy consumption across two operational states defined by PUE and IT load. It is ideal for feasibility analysis of infrastructure upgrades, cooling improvements, or hardware changes where you want to quantify the overhead energy impact without needing live electricity prices or profitability projections.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-19T19:06:07.925Z","isFirstParty":false,"canonicalSlug":"mining-facility-overhead-energy-pue-before-and-after-comparison-144f21b6"}