{"uid":"cap_cQqEy5YqWrsjjKRK7HkQp","slug":"asic-upgrade-daily-contribution-change-base-100-rebase-report-a8115711","name":"ASIC Upgrade Daily Contribution Change — Base-100 Rebase Report","description":"ASIC upgrade daily contribution change — Base-100 rebase report: Base-100 rebase report for ASIC upgrade daily contribution change. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded base-100 rebase report report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-upgrade-benefit-index?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["extra_revenue_usd","saved_energy_usd","extra_overhead_usd"],"properties":{"saved_energy_usd":{"type":"number","default":2,"maximum":10000000000000000,"minimum":-1000000000000},"extra_revenue_usd":{"type":"number","default":3,"maximum":10000000000000000,"minimum":-1000000000000},"extra_overhead_usd":{"type":"number","default":1,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"saved_energy_usd":2,"extra_revenue_usd":3,"extra_overhead_usd":1},{"saved_energy_usd":2.2,"extra_revenue_usd":3.3000000000000003,"extra_overhead_usd":1.1},{"saved_energy_usd":2,"extra_revenue_usd":3,"extra_overhead_usd":1},{"saved_energy_usd":2.2,"extra_revenue_usd":3.3000000000000003,"extra_overhead_usd":1.1}],"maxItems":200,"minItems":2},"base_index":{"type":"integer","default":0,"maximum":199,"minimum":0}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_fcC2YCiRGuFixEbb7OcdU","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes a Base-100 rebased index series showing the daily net contribution change from an ASIC mining hardware upgrade, given extra revenue, saved energy costs, and extra overhead inputs.","exampleAgentPrompt":"Can you run a Base-100 rebase report for our ASIC upgrade contribution changes? We have 4 daily data points: day 1 saved $2 energy, earned $3 extra revenue, $1 extra overhead; day 2 saved $2.20, earned $3.30, $1.10 overhead; day 3 same as day 1; day 4 same as day 2 — use day 1 (index 0) as the base.","exampleUseCases":[{"title":"Evaluating two-week ASIC upgrade ROI","prompt":"I have two weeks of daily figures from our ASIC upgrade — each day I know how much we saved on electricity, how much extra Bitcoin revenue we earned, and any new overhead costs. Can you normalize all of that into a Base-100 index starting from day 1 so I can see the trend?"},{"title":"Comparing old vs new miner contribution","prompt":"We switched to new ASICs on day 3 of our data set. I have 5 days of extra_revenue_usd, saved_energy_usd, and extra_overhead_usd figures. Can you give me a Base-100 rebase report using day 3 (index 2) as the baseline so I can see the relative contribution shift?"},{"title":"Monitoring energy savings impact over time","prompt":"Our energy savings from the ASIC upgrade are varying a lot each day. I have 10 days of data with daily extra revenue between $50-$200, energy savings $30-$120, and overhead $10-$40. Can you rebase this to a Base-100 index from day 1 so we can track whether the upgrade is paying off?"}],"resultDescription":"Returns a Base-100 rebased index report showing how the net daily contribution (extra_revenue_usd + saved_energy_usd − extra_overhead_usd) for each input row compares to the selected base row, expressed as normalized index values. The report uses a fixed formula with disclosed units; no live prices or guaranteed returns are included.","failureModes":["Fewer than 2 rows provided — API requires minItems: 2","base_index out of range — must be between 0 and (number of rows − 1), max 199","Row values exceed allowed range — extra_overhead_usd must be ≥ 0; revenue/energy values must be within bounds","More than 200 rows submitted — exceeds maxItems limit","Missing required fields in any row (extra_revenue_usd, saved_energy_usd, or extra_overhead_usd)","Payment failure — endpoint requires 0.01 USDC via x402 protocol"],"whenToPreferThis":"Use this endpoint when you need a normalized, Base-100 indexed view of the net financial contribution from an ASIC mining hardware upgrade across multiple days or scenarios. It is purpose-built for this mining-upgrade preset and applies a fixed, disclosed formula — making it ideal for reproducible, auditable comparisons. Choose it over a generic spreadsheet or custom computation when you want a standardized rebase output without building the normalization logic yourself.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-19T19:17:45.414Z","isFirstParty":false,"canonicalSlug":"asic-upgrade-daily-contribution-change-base-100-rebase-report-a8115711"}