{"uid":"cap_bzTV5YQqwAfy8GdRAahPJ","slug":"two-component-kit-capacity-target-gap-calculator-da545643","name":"Two-Component Kit Capacity — Target Gap Calculator","description":"Two-component kit capacity - Target gap calculation: Target gap calculation for Two-component kit capacity. Supplied retail figures only, up to 200 records. No platform access, live rates or order execution. One of 25 new profiles across 20 shared operations in this industry. 0.01 USDC includes one bounded target gap calculation report.","url":"https://market.datapackvibe.com/x402/assistant-ar-retail-two-component-kit-target-gap?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"target":{"type":"number","default":100,"maximum":1000000000000000000,"minimum":-1000000000000000000},"values":{"type":"object","default":{"a_per_kit":2,"b_per_kit":3,"component_a_units":100,"component_b_units":90},"required":["component_a_units","a_per_kit","component_b_units","b_per_kit"],"properties":{"a_per_kit":{"type":"integer","default":2,"maximum":1000000,"minimum":1},"b_per_kit":{"type":"integer","default":3,"maximum":1000000,"minimum":1},"component_a_units":{"type":"integer","default":100,"maximum":1000000,"minimum":0},"component_b_units":{"type":"integer","default":90,"maximum":1000000,"minimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_wQBJ4p4lJDTZ9XghTF27d","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates the target gap (shortfall or surplus) for a two-component kit assembly given current inventory levels and per-kit component requirements.","exampleAgentPrompt":"I have 100 units of component A and 90 units of component B, each kit needs 2 of A and 3 of B — can you calculate the target gap if I'm aiming for a production target of 100 kits?","exampleUseCases":[{"title":"Retail kit shortfall before reorder","prompt":"We have 500 units of component A and 420 units of component B in our retail warehouse. Each two-component kit needs 2 units of A and 3 units of B, and our target is 200 kits. Tell me the gap between what we can make and our target."},{"title":"Production planning for assembly line","prompt":"Our assembly line target is 150 kits this week. We currently stock 280 units of component A and 310 units of component B, with each kit requiring 2 units of A and 2 units of B. What's our capacity gap?"},{"title":"Inventory audit surplus check","prompt":"We have 1000 units of component A and 800 units of component B. Each kit takes 1 unit of A and 2 units of B. Our target is 400 kits — are we over or under, and by how much?"}],"resultDescription":"A bounded target gap calculation report indicating the difference between the desired kit target and the maximum number of kits producible from current component inventory. Includes the limiting component and the numeric gap (positive for shortfall, negative for surplus). Up to 200 records supported with retail-supplied figures only.","failureModes":["Invalid component units (negative or non-integer values) return a validation error","Per-kit quantities below 1 are rejected","Target value outside supported numeric bounds returns an error","Missing required fields (component_a_units, a_per_kit, component_b_units, b_per_kit) result in a 400 bad request","Values exceeding 1,000,000 units per component are out of range"],"whenToPreferThis":"Choose this endpoint when you need a fast, cost-effective ($0.01 USDC) computation of kit production capacity gap from user-supplied retail inventory figures — specifically for two-component kit assemblies. Ideal when you already have component stock counts and per-kit requirements and simply need the arithmetic gap against a production target, without needing live ERP integration, order execution, or multi-component support.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-12T00:44:28.728Z","isFirstParty":false,"canonicalSlug":"two-component-kit-capacity-target-gap-calculator-da545643"}