{"uid":"cap_b9guiGw4SLDDuksrXaSCl","slug":"mining-facility-overhead-energy-weighted-result-mean-ed5b50f6","name":"Mining Facility Overhead Energy — Weighted Result Mean","description":"Mining facility overhead energy — Weighted result mean: Weighted result mean for Mining facility overhead energy. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded weighted result mean report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-pue-overhead-weighted-mean?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"default":[{"pue":1.2,"it_kwh":720},{"pue":1.32,"it_kwh":792.0000000000001},{"pue":1.2,"it_kwh":720},{"pue":1.32,"it_kwh":792.0000000000001}],"maxItems":200,"minItems":2},"weights":{"type":"array","items":{"type":"number","default":1,"maximum":1000000000000,"minimum":0},"default":[1,2,1,2],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_rbr7e3l7kWjkwF3taPuNS","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes a weighted mean of total mining facility energy (IT load × PUE) across multiple scenario rows using supplied weights.","exampleAgentPrompt":"Give me the weighted mean total energy for these four mining facility scenarios: rows [{pue:1.2, it_kwh:720}, {pue:1.32, it_kwh:792}, {pue:1.2, it_kwh:720}, {pue:1.32, it_kwh:792}] with weights [1, 2, 1, 2].","exampleUseCases":[{"title":"Blending two data-center tiers by capacity","prompt":"I have two mining tiers — a high-efficiency hall using PUE 1.15 drawing 5000 kWh IT load and a legacy hall at PUE 1.45 drawing 2000 kWh — weight the first hall three times as heavily and give me the weighted mean total facility energy."},{"title":"Quarterly scenario planning for energy budget","prompt":"For our Q3 energy budget, compute the weighted mean mining facility overhead across these six planned operating configurations with PUE values ranging from 1.1 to 1.5 and IT loads from 300 to 9000 kWh; weight them by expected runtime hours [10, 40, 80, 80, 60, 30]."},{"title":"Comparing cooling retrofit impact on fleet average","prompt":"Before and after our cooling retrofit I have 8 facility snapshots — 4 pre-retrofit rows with PUE around 1.4 and 4 post-retrofit rows at PUE 1.2, all at 1500 kWh IT load — weight post-retrofit rows twice as heavily and tell me the weighted mean total energy."}],"resultDescription":"Returns a single bounded weighted result mean value representing the average total facility energy (overhead energy = IT kWh × PUE) across all supplied scenario rows, weighted by the provided weights array. The report includes the formula and units used; no live prices or return guarantees are provided.","failureModes":["Fewer than 2 rows provided — minimum 2 items required in rows array","Weights array length does not match rows array length — mismatched arrays cause validation error","PUE value outside range [1, 10] — rejected with validation error","it_kwh value of 0 or negative — exclusiveMinimum enforced","More than 200 rows submitted — maxItems limit exceeded","All weights are zero — undefined weighted mean result","Payment of 0.01 USDC not completed — x402 payment required before response"],"whenToPreferThis":"Choose this endpoint when you need a single summary statistic — the weighted mean — of total mining facility energy (IT load multiplied by PUE overhead factor) across multiple heterogeneous scenarios, and you want to weight scenarios by importance, runtime, capacity, or any other factor. Prefer it over batch or single-calculation endpoints when you already have multiple configurations and need to collapse them into one representative figure. It is not suitable for real-time energy monitoring, live electricity pricing, or guaranteed ROI projections.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:47:41.646Z","isFirstParty":false,"canonicalSlug":"mining-facility-overhead-energy-weighted-result-mean-ed5b50f6"}