{"uid":"cap_XA1gf6R-rTKpkoZ_Duffr","slug":"project-risks-base-100-series-and-equal-width-histogram-ea895d04","name":"Project Risks Base-100 Series and Equal-Width Histogram","description":"Project risks — Base-100 series + Equal-width histogram: Base-100 series + Equal-width histogram for supplied project risks records (open_items, mitigated_items). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-operations-23-163?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"bins":{"type":"integer","default":5,"maximum":30,"minimum":1},"rows":{"type":"array","items":{"type":"object","required":["row_id","team_group","date","open_items","mitigated_items"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"open_items":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"team_group":{"type":"string","default":"","maxLength":80},"mitigated_items":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","open_items":10,"team_group":"group-a","mitigated_items":1},{"date":"2026-10-02","row_id":"row-2","open_items":20,"team_group":"group-b","mitigated_items":2},{"date":"2026-10-03","row_id":"row-3","open_items":15,"team_group":"group-a","mitigated_items":3},{"date":"2026-10-04","row_id":"row-4","open_items":30,"team_group":"group-b","mitigated_items":4}],"maxItems":200,"minItems":1},"field":{"enum":["open_items","mitigated_items"],"type":"string","default":"open_items"},"base_index":{"type":"integer","default":0,"maximum":199,"minimum":0}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_4XrprB7buGnk4veC3C7Lw","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a Base-100 indexed time series and an equal-width histogram for project risk data (open_items and mitigated_items) supplied by the caller.","exampleAgentPrompt":"Take these 4 project risk records for group-a and group-b from October 2026 and give me a Base-100 series indexed from row 0 plus an equal-width histogram with 5 bins for the open_items field: row-1 2026-10-01 group-a open=10 mitigated=1, row-2 2026-10-02 group-b open=20 mitigated=2, row-3 2026-10-03 group-a open=15 mitigated=3, row-4 2026-10-04 group-b open=30 mitigated=4.","exampleUseCases":[{"title":"Baseline open risk trend for sprint","prompt":"I have weekly open risk counts for our engineering team from Q3. Can you normalize them to a Base-100 series starting from the first week and also show me a 5-bin histogram so I can see how the risk levels are distributed? Here are the records: row-1 2025-07-07 eng-team open=42 mitigated=5, row-2 2025-07-14 eng-team open=38 mitigated=8, row-3 2025-07-21 eng-team open=55 mitigated=12, row-4 2025-07-28 eng-team open=30 mitigated=20."},{"title":"Mitigated items histogram for compliance audit","prompt":"For our compliance audit I need a histogram with 10 bins for the mitigated_items field across these project records, plus a Base-100 index starting from the first entry: row-1 2025-09-01 compliance-a open=100 mitigated=20, row-2 2025-09-08 compliance-b open=80 mitigated=35, row-3 2025-09-15 compliance-a open=60 mitigated=50, row-4 2025-09-22 compliance-b open=40 mitigated=70."},{"title":"Multi-team risk comparison indexed series","prompt":"We have two teams — alpha and beta — and I want to compare how their open risk items trended relative to baseline. Can you produce a Base-100 series indexed from row 2 and a 7-bin equal-width histogram for open_items? Records: row-1 2025-11-01 alpha open=200 mitigated=10, row-2 2025-11-02 beta open=180 mitigated=15, row-3 2025-11-03 alpha open=220 mitigated=25, row-4 2025-11-04 beta open=160 mitigated=30, row-5 2025-11-05 alpha open=240 mitigated=40."}],"resultDescription":"Returns two analytical reports for the supplied project risk records: (1) a Base-100 indexed time series normalizing the selected field (open_items or mitigated_items) relative to the specified base_index row, and (2) an equal-width histogram dividing the selected field's value range into the specified number of bins with frequency counts. Both reports are computed locally on the submitted data with no external lookups.","failureModes":["Fewer than 1 or more than 200 rows submitted — validation error","base_index references a row index outside the submitted row count — error","bins value outside 1–30 range — validation error","Missing required fields (row_id, team_group, date, open_items, mitigated_items) in any row — schema validation failure","Date values not matching YYYY-MM-DD pattern — validation error","All values for selected field are null — histogram and index cannot be computed"],"whenToPreferThis":"Choose this endpoint when you have project risk records with open and mitigated item counts and need both a normalized baseline index and a frequency distribution histogram in a single call for up to 200 rows. It is ideal for offline or batch analytical workflows where no live data lookup, prediction, or external action is needed and cost efficiency matters (two reports per $0.01).","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-20T12:46:42.699Z","isFirstParty":false,"canonicalSlug":"project-risks-base-100-series-and-equal-width-histogram-ea895d04"}