{"uid":"cap_UglD50HmVCWrJXBtfx1Eu","slug":"mining-net-capital-requirement-target-gap-calculator-9157fee7","name":"Mining Net Capital Requirement — Target Gap Calculator","description":"Mining net capital requirement — Target gap calculation: Target gap calculation for Mining net capital requirement. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded target gap calculation report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-net-capital-target-gap?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"target":{"type":"number","default":100,"maximum":1000000000000000000,"minimum":-1000000000000000000},"values":{"type":"object","default":{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},"required":["hardware_usd","installation_usd","rebates_usd"],"properties":{"rebates_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0},"hardware_usd":{"type":"number","default":30000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"installation_usd":{"type":"number","default":5000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_zLijjaxeWfahJTksG9nJV","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates the target gap for mining net capital requirements given hardware, installation, and rebate assumptions","exampleAgentPrompt":"Calculate my mining net capital target gap — my target is $500,000, hardware costs $30,000, installation is $5,000, and I have $1,000 in rebates.","exampleUseCases":[{"title":"New mining rig capital shortfall check","prompt":"I'm setting up a new mining rig and need to know my capital gap. My target is $200,000, hardware costs $45,000, installation is $8,000, and I have $2,500 in rebates. What's my target gap?"},{"title":"Scaled mining fleet capital assessment","prompt":"Can you calculate the net capital target gap for a scaled mining operation? Target is $5,000,000, hardware is $750,000, installation is $120,000, and rebates total $25,000."},{"title":"Mining startup minimum viable capital gap","prompt":"I'm starting small in crypto mining — target is $100,000, hardware is $30,000, installation is $5,000, and I'm getting $1,000 in rebates. Run the target gap calculation for me."}],"resultDescription":"A bounded target gap calculation report detailing the difference between the specified capital target and the net capital position derived from hardware costs, installation costs, and rebates for a mining operation. Delivered as a single structured report per call.","failureModes":["Missing required fields (hardware_usd, installation_usd, rebates_usd) returns validation error","hardware_usd of zero or negative violates exclusiveMinimum constraint","Values exceeding the maximum bounds (1e16 for costs, 1e18 for target) are rejected","Malformed JSON body returns parse error","Payment not received results in 402 response"],"whenToPreferThis":"Use this endpoint when you need a fast, low-cost ($0.01 USDC) calculation of the net capital target gap for a mining operation given known hardware, installation, and rebate inputs. Prefer this over general financial calculators when the specific mining net capital formula and bounded output report format are required. Not suitable for live pricing, guaranteed returns, or general investment analysis.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:45.667Z","isFirstParty":false,"canonicalSlug":"mining-net-capital-requirement-target-gap-calculator-9157fee7"}