{"uid":"cap_SP3ViEZM6UPSAeUikkmw2","slug":"mining-cooling-electricity-cost-batch-calculation-c2963766","name":"Mining Cooling Electricity Cost — Batch Calculation","description":"Mining cooling electricity cost — Batch calculation: Batch calculation for Mining cooling electricity cost. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded batch calculation report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-cooling-cost-batch?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["cooling_kw","hours","usd_per_kwh"],"properties":{"hours":{"type":"number","default":24,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"cooling_kw":{"type":"number","default":5,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"usd_per_kwh":{"type":"number","default":0.05,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"default":[{"hours":24,"cooling_kw":5,"usd_per_kwh":0.05},{"hours":26.400000000000002,"cooling_kw":5.5,"usd_per_kwh":0.05500000000000001}],"maxItems":200,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_jvfzQ7No1k6KjBfleduEM","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates the electricity cost of mining cooling systems for multiple scenarios in a single batch request, given cooling power draw, hours of operation, and electricity rate.","exampleAgentPrompt":"Calculate the cooling electricity costs for two mining setups in a batch: the first runs 5 kW of cooling for 24 hours at $0.05 per kWh, and the second runs 5.5 kW for 26.4 hours at $0.055 per kWh.","exampleUseCases":[{"title":"Daily cooling cost for small mining farm","prompt":"Give me a batch cooling cost calculation for my three mining rigs: rig 1 uses 4 kW of cooling for 24 hours at $0.06/kWh, rig 2 uses 7 kW for 24 hours at $0.06/kWh, and rig 3 uses 10 kW for 20 hours at $0.07/kWh."},{"title":"Comparing electricity rates across regions","prompt":"I want to compare cooling electricity costs for the same 8 kW cooling load running 720 hours — one scenario at $0.04/kWh, one at $0.08/kWh, and one at $0.12/kWh. Can you batch those three calculations?"},{"title":"Monthly cooling cost projection for scaling operation","prompt":"Batch calculate my monthly mining cooling electricity costs: I'm scaling from 3 kW for 744 hours at $0.05/kWh up to 6 kW, 9 kW, and 12 kW at the same rate and duration — give me all four in one report."}],"resultDescription":"A bounded batch calculation report containing per-row cooling electricity cost estimates (in USD) for each submitted combination of cooling power (kW), hours of operation, and electricity price (USD/kWh), covering up to 200 rows per request. Results are based solely on supplied mining assumptions; no live prices or guaranteed returns are included.","failureModes":["Missing required fields (cooling_kw, hours, usd_per_kwh) in any row returns a validation error","Rows exceeding 200 items will be rejected (maxItems constraint)","Zero or negative values for cooling_kw, hours, or usd_per_kwh are rejected (exclusiveMinimum: 0)","Payment failure or insufficient USDC balance will block the request","Extremely large numeric values may produce overflow or precision issues"],"whenToPreferThis":"Choose this endpoint when you need to evaluate cooling electricity costs across multiple mining scenarios simultaneously (up to 200 rows) without making individual API calls per scenario. It is purpose-built for mining cooling cost arithmetic using user-supplied assumptions, making it ideal for sensitivity analysis, rate comparisons, or scaling projections. Prefer this over single-row calculators when batch throughput matters.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:26.894Z","isFirstParty":false,"canonicalSlug":"mining-cooling-electricity-cost-batch-calculation-c2963766"}