{"uid":"cap_SB7Cv3vfH40Wb7yAxcyZU","slug":"mining-facility-energy-with-pue-weighted-result-mean-b60f99c9","name":"Mining Facility Energy with PUE — Weighted Result Mean","description":"Mining facility energy with PUE — Weighted result mean: Weighted result mean for Mining facility energy with PUE. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded weighted result mean report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-facility-energy-weighted-mean?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"default":[{"pue":1.2,"it_kwh":720},{"pue":1.32,"it_kwh":792.0000000000001},{"pue":1.2,"it_kwh":720},{"pue":1.32,"it_kwh":792.0000000000001}],"maxItems":200,"minItems":2},"weights":{"type":"array","items":{"type":"number","default":1,"maximum":1000000000000,"minimum":0},"default":[1,2,1,2],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_yiD_B1GdnWKmuoZMqRkv6","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes a weighted arithmetic mean of total facility energy consumption (IT load × PUE) across multiple mining facility scenarios.","exampleAgentPrompt":"Calculate the weighted mean total facility energy for my two mining sites: site A draws 720 kWh IT load with a PUE of 1.2 (weight 1) and site B draws 792 kWh with a PUE of 1.32 (weight 2).","exampleUseCases":[{"title":"Compare facility energy across mining sites","prompt":"I have three mining facilities with different efficiencies — site 1 runs 500 kWh IT load at PUE 1.15 (weight 3), site 2 runs 1200 kWh at PUE 1.4 (weight 1), and site 3 runs 800 kWh at PUE 1.25 (weight 2). Give me the weighted mean total facility energy."},{"title":"Evaluate energy impact of PUE upgrade","prompt":"I want to see the weighted average facility energy before and after a PUE upgrade on my mining operation. Before: 1000 kWh IT load, PUE 1.5 (weight 1); after: 1000 kWh IT load, PUE 1.2 (weight 2). What's the weighted mean?"},{"title":"Aggregate energy across differently sized mining rigs","prompt":"I'm modeling four mining rigs with varying loads and efficiencies — 200 kWh at PUE 1.1 (weight 4), 600 kWh at PUE 1.3 (weight 2), 450 kWh at PUE 1.2 (weight 3), and 900 kWh at PUE 1.45 (weight 1). Can you compute the weighted mean facility energy for the whole fleet?"}],"resultDescription":"Returns a single bounded weighted result mean report representing the weighted average total facility energy (IT kWh × PUE) across all supplied rows, using the provided weight vector. The output includes the computed weighted mean value with formula and units disclosed.","failureModes":["Fewer than 2 rows provided — minItems validation failure","PUE value below 1 or above 10 — schema validation error","IT kWh value of 0 or negative — exclusiveMinimum violation","Weights array length does not match rows array length — mismatch error","More than 200 rows submitted — maxItems exceeded","Payment of 0.01 USDC not included or rejected — 402 Payment Required"],"whenToPreferThis":"Choose this endpoint when you need a statistically weighted average of total facility energy (IT load multiplied by PUE) across 2–200 mining facility scenarios, using custom weights per row. Prefer this over simple averages when facilities differ in importance, capacity, or reliability and you want importance-weighted aggregation rather than equal treatment. Best suited for fleet-level energy benchmarking, site efficiency comparisons, or reporting pipelines where PUE-adjusted energy is the primary metric.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:47:59.692Z","isFirstParty":false,"canonicalSlug":"mining-facility-energy-with-pue-weighted-result-mean-b60f99c9"}