{"uid":"cap_PzvKJ-Sq-gkofszp_3kif","slug":"mining-facility-energy-with-pue-batch-calculation-94a893ab","name":"Mining Facility Energy with PUE — Batch Calculation","description":"Mining facility energy with PUE — Batch calculation: Batch calculation for Mining facility energy with PUE. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded batch calculation report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-facility-energy-batch?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"default":[{"pue":1.2,"it_kwh":720},{"pue":1.32,"it_kwh":792.0000000000001}],"maxItems":200,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_NEU6QH5DK5BhVjQ_sW3ry","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates total facility energy consumption from IT load and Power Usage Effectiveness (PUE) for up to 200 mining facility configurations in a single batch call.","exampleAgentPrompt":"Calculate the total facility energy for two mining setups: the first draws 720 kWh of IT load with a PUE of 1.2, and the second draws 792 kWh with a PUE of 1.32 — run them as a batch and give me the results.","exampleUseCases":[{"title":"Comparing PUE efficiency across mining sites","prompt":"I have three mining facilities with different cooling efficiencies — site A uses 500,000 kWh IT load at PUE 1.15, site B uses 800,000 kWh at PUE 1.4, and site C uses 300,000 kWh at PUE 1.6. Can you batch-calculate the total facility energy for all three so I can compare their overhead?"},{"title":"Monthly energy budgeting for mining operation","prompt":"I need to estimate total facility power draw for my mining operation across 12 monthly scenarios — each month has a different IT load ranging from 600 kWh to 900 kWh and my PUE is consistently 1.25. Can you run all 12 as a batch and give me the total energy figures?"},{"title":"Sensitivity analysis on PUE improvements","prompt":"I want to see how much total facility energy I'd save by improving my PUE from 1.8 down to 1.1 in 0.1 increments, with a fixed IT load of 1,000,000 kWh each time. Please batch-calculate all those scenarios for me."}],"resultDescription":"A bounded batch calculation report containing total facility energy consumption (IT kWh multiplied by PUE) for each submitted row, covering up to 200 input configurations per call. The formula and units are disclosed in the response; no live prices, mining rewards, or guaranteed returns are included.","failureModes":["Empty rows array or missing required fields (it_kwh or pue) returns a validation error","PUE value outside range [1, 10] causes row-level rejection","it_kwh of zero or negative value is rejected (exclusiveMinimum: 0)","Batch exceeding 200 rows returns an error for exceeding maxItems","Payment of 0.01 USDC not completed via x402 protocol results in 402 Payment Required","Malformed JSON body returns a parse error"],"whenToPreferThis":"Choose this endpoint when you need to compute facility-level energy (IT load × PUE) for one or many mining configurations in a single API call. It is purpose-built for mining facility energy estimation with PUE overhead and supports up to 200 rows per batch, making it ideal for scenario analysis, budget modeling, or multi-site comparisons. Prefer it over manual calculation or generic computation tools when you need a structured, auditable energy report with disclosed formula and units.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:43.814Z","isFirstParty":false,"canonicalSlug":"mining-facility-energy-with-pue-batch-calculation-94a893ab"}