{"uid":"cap_PllgLCEYoZrPiFvYHSpyl","slug":"mining-power-capacity-headroom-target-gap-calculation-4f3cc367","name":"Mining Power Capacity Headroom — Target Gap Calculation","description":"Mining power capacity headroom — Target gap calculation: Target gap calculation for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded target gap calculation report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-target-gap?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"target":{"type":"number","default":100,"maximum":1000000000000000000,"minimum":-1000000000000000000},"values":{"type":"object","default":{"capacity_kw":100,"committed_kw":70},"required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_wumrR5sQDKJ2DJm7xrArq","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates the target gap (headroom) between total mining power capacity and committed load, given user-supplied capacity and committed kilowatt values against a numeric target.","exampleAgentPrompt":"I have 500 kW of total mining power capacity and 320 kW already committed — can you calculate the target gap for a headroom target of 200 kW so I know how far off I am?","exampleUseCases":[{"title":"Mining farm capacity planning check","prompt":"My mining farm has 800 kW of capacity and 600 kW committed to rigs right now — what's the target gap if my headroom target is 150 kW?"},{"title":"Data center mining power audit","prompt":"We're auditing our data center mining power: total capacity is 2000 kW, committed load is 1750 kW, and our target headroom is 300 kW — calculate the gap for me."},{"title":"New miner deployment feasibility","prompt":"Before I add more ASICs, I want to know the power headroom gap — I've got 1200 kW capacity, 900 kW committed, and a target of 250 kW headroom. Can you run the target gap calculation?"}],"resultDescription":"A bounded target gap calculation report showing the numeric difference between the mining power capacity headroom (capacity_kw minus committed_kw) and the specified target value, expressed in the units provided. The report uses the supplied mining assumptions and disclosed formula; no live prices or guaranteed returns are included.","failureModes":["capacity_kw or committed_kw not provided or zero — validation error returned","target value out of supported numeric range — rejection or clamped result","committed_kw exceeds capacity_kw — may return negative headroom or error","Malformed request body — 400-level error","Payment of 0.01 USDC not processed — 402 Payment Required"],"whenToPreferThis":"Use this endpoint when you need a fast, low-cost ($0.01 USDC) calculation of the power headroom gap between a mining operation's total capacity and committed load relative to a numeric target. It is ideal for capacity planning, pre-deployment feasibility checks, or power audits where you have capacity_kw and committed_kw figures on hand and want an objective, formula-driven gap report without needing live market prices.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-12T21:35:13.941Z","isFirstParty":false,"canonicalSlug":"mining-power-capacity-headroom-target-gap-calculation-4f3cc367"}