{"uid":"cap_PDSX4CNoCslWJH9jdnGys","slug":"whole-asics-within-a-power-budget-base-100-rebase-report-852edfa9","name":"Whole ASICs within a Power Budget — Base-100 Rebase Report","description":"Whole ASICs within a power budget — Base-100 rebase report: Base-100 rebase report for Whole ASICs within a power budget. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded base-100 rebase report report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-capacity-units-index?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["available_kw","kw_each"],"properties":{"kw_each":{"type":"number","default":3,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"available_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"default":[{"kw_each":3,"available_kw":100},{"kw_each":3.3000000000000003,"available_kw":110.00000000000001},{"kw_each":3,"available_kw":100},{"kw_each":3.3000000000000003,"available_kw":110.00000000000001}],"maxItems":200,"minItems":2},"base_index":{"type":"integer","default":0,"maximum":199,"minimum":0}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_yJknCv5DFMY07KGmcgiXQ","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Given a list of ASIC power draws and available power budgets, computes how many whole ASICs fit within each scenario and rebases all values to 100 relative to a chosen baseline row.","exampleAgentPrompt":"I have 4 ASIC mining scenarios — 100 kW available with 3 kW each, 110 kW with 3.3 kW each, 90 kW with 3 kW each, and 120 kW with 4 kW each — can you compute how many whole ASICs fit in each and give me a base-100 index relative to the first scenario?","exampleUseCases":[{"title":"Baseline-normalized ASIC fleet sizing","prompt":"I'm planning two data center power configurations: 200 kW available with 6.5 kW per ASIC, and 250 kW available with 6.5 kW per ASIC. Can you calculate how many whole ASICs fit in each and rebase the results to 100 using the 200 kW scenario as the baseline?"},{"title":"Comparing ASIC efficiency across power tiers","prompt":"I have three mining setups to compare — 80 kW with 2.5 kW per miner, 100 kW with 3 kW per miner, and 150 kW with 3.5 kW per miner. Show me the whole unit counts and index them all relative to the 80 kW scenario."},{"title":"Power budget sensitivity analysis","prompt":"Run me a base-100 capacity report for five power scenarios: 50 kW, 75 kW, 100 kW, 125 kW, and 150 kW, all using ASICs that draw 4 kW each, and use the 100 kW row as the base index."}],"resultDescription":"The endpoint returns a base-100 rebased report showing, for each input row, the number of whole ASICs that fit within the available power budget (floor division of available_kw by kw_each), with all values normalized so that the row specified by base_index equals 100. This allows direct proportional comparison across scenarios without live pricing or profitability projections.","failureModes":["Invalid or missing required fields (available_kw or kw_each) returns a validation error","base_index out of range (≥ number of rows) causes an error","Fewer than 2 rows provided returns a schema validation failure","Non-positive values for kw_each or available_kw are rejected due to exclusiveMinimum:0 constraint","Payment failure or insufficient USDC balance returns a 402 or payment error"],"whenToPreferThis":"Choose this endpoint when you need a normalized, index-style comparison of how many whole ASIC mining units fit within different power budgets — especially when you want the results expressed relative to a baseline scenario (base-100). It is not a live profitability calculator; it focuses purely on capacity arithmetic with formula transparency. Prefer it over generic spreadsheet calculations when you need a repeatable, API-callable rebase report for multiple scenarios in one call.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-14T13:29:24.394Z","isFirstParty":false,"canonicalSlug":"whole-asics-within-a-power-budget-base-100-rebase-report-852edfa9"}