{"uid":"cap_ObF0OOVVM4EH235qWQx76","slug":"mining-fleet-spare-coverage-two-input-scenario-grid-c8ba0c30","name":"Mining Fleet Spare Coverage — Two-Input Scenario Grid","description":"Mining fleet spare coverage — Two-input scenario grid: Two-input scenario grid for Mining fleet spare coverage. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded two-input scenario grid report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-spares-coverage-stress-grid?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"field_x":{"enum":["spare_units","operating_units"],"type":"string","default":"spare_units"},"field_y":{"enum":["spare_units","operating_units"],"type":"string","default":"operating_units"},"baseline":{"type":"object","default":{"spare_units":5,"operating_units":100},"required":["spare_units","operating_units"],"properties":{"spare_units":{"type":"number","default":5,"maximum":10000000000000000,"minimum":0},"operating_units":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"values_x":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[5,5.5],"maxItems":10,"minItems":1},"values_y":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[100,110.00000000000001],"maxItems":10,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_hf9y1sknvQ-ZpsMzm1f4w","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a two-input scenario grid showing spare unit coverage ratios across combinations of spare_units and operating_units for mining fleet analysis","exampleAgentPrompt":"Run a spare coverage scenario grid for my mining fleet with a baseline of 5 spare units and 100 operating units — vary spare_units across [4, 5, 6, 7, 8] on the X axis and operating_units across [80, 90, 100, 110, 120] on the Y axis.","exampleUseCases":[{"title":"Fleet expansion spare planning","prompt":"I'm scaling my mining fleet from 100 to 140 operating units over the next phase — can you run a scenario grid varying operating units from 100 to 140 in steps and spare units from 5 to 10, with a baseline of 5 spares and 100 operating units, so I can see how my coverage ratio holds up?"},{"title":"Spare inventory reduction stress test","prompt":"We're considering cutting spare units from 5 down to 3 to reduce holding costs. Run a two-input grid with spare_units on the X axis at [3, 4, 5] and operating_units on the Y axis at [90, 100, 110, 120], baseline 5 spare and 100 operating, so I can see the coverage impact before we commit."},{"title":"Optimizing spare ratio for new mine site","prompt":"For our new site we're planning 150 operating units — can you generate a spare coverage grid with operating_units varying across [130, 140, 150, 160] and spare_units across [6, 7, 8, 9, 10], baseline 7 spare and 150 operating, to figure out the right spare ratio?"}],"resultDescription":"A bounded two-input scenario grid report showing spare coverage values for every combination of the supplied X-axis and Y-axis values, computed from the baseline assumptions using the disclosed formula and units. No live prices or guaranteed returns are included.","failureModes":["values_x or values_y arrays exceed 10 items — request rejected","operating_units set to zero or negative (exclusiveMinimum violation)","spare_units or operating_units exceed allowable maximum","field_x and field_y set to the same variable, producing a degenerate grid","Payment of 0.01 USDC not successfully processed via x402 protocol"],"whenToPreferThis":"Choose this endpoint when you need a structured two-dimensional sensitivity table for mining fleet spare coverage across combinations of spare unit counts and operating unit counts, with full control over axis variables and scenario ranges. Prefer it over single-point calculations when planning fleet scaling, evaluating inventory cuts, or stress-testing spare ratios across multiple scenarios simultaneously.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:47:46.446Z","isFirstParty":false,"canonicalSlug":"mining-fleet-spare-coverage-two-input-scenario-grid-c8ba0c30"}