{"uid":"cap_Ibc2KiGmPMmusqDMYIsLr","slug":"asic-efficiency-improvement-sequential-input-change-attribution-b1641487","name":"ASIC Efficiency Improvement — Sequential Input-Change Attribution","description":"ASIC efficiency improvement — Sequential input-change attribution: Sequential input-change attribution for ASIC efficiency improvement. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded sequential input-change attribution report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-efficiency-saving-waterfall?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"after":{"type":"object","default":{"new_jth":22,"old_jth":27.500000000000004},"required":["old_jth","new_jth"],"properties":{"new_jth":{"type":"number","default":20,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"old_jth":{"type":"number","default":25,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"before":{"type":"object","default":{"new_jth":20,"old_jth":25},"required":["old_jth","new_jth"],"properties":{"new_jth":{"type":"number","default":20,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"old_jth":{"type":"number","default":25,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_62sSUM08bt1ctdIEhEpL8","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes a sequential (waterfall) attribution report showing how changes in ASIC joules-per-terahash (J/TH) efficiency affect mining economics, comparing before and after scenarios.","exampleAgentPrompt":"Run a sequential input-change attribution waterfall for my ASIC upgrade: before the upgrade my miner was 25 J/TH dropping to 20 J/TH, and after the upgrade it went from 27.5 J/TH down to 22 J/TH — show me how the efficiency improvement breaks down.","exampleUseCases":[{"title":"Evaluating next-gen ASIC hardware upgrade","prompt":"I'm considering upgrading my miners — before the upgrade they go from 30 J/TH to 25 J/TH, and after the upgrade from 22 J/TH to 18 J/TH. Can you run a sequential attribution waterfall to show me exactly how much of the efficiency improvement comes from each input change?"},{"title":"Auditing efficiency gains for mining fleet report","prompt":"I need to produce an attribution report for our mining fleet efficiency review. The baseline scenario has old J/TH of 27.5 and new J/TH of 22, and the improved scenario has old J/TH of 25 and new J/TH of 20. Break down the sequential input-change contributions for me."},{"title":"Comparing two firmware tuning stages","prompt":"We tuned our ASICs in two stages — first stage went from 35 J/TH to 28 J/TH, second stage from 28 J/TH to 21 J/TH. Can you do a waterfall attribution to show how each stage contributed to our overall efficiency improvement?"}],"resultDescription":"A bounded sequential input-change attribution report that breaks down how each change in J/TH (joules per terahash) across the before and after scenarios contributes to overall ASIC efficiency improvement, presented as a waterfall/step-by-step attribution using the supplied mining assumptions and disclosed formula and units. No live prices or guaranteed return projections are included.","failureModes":["Zero or negative J/TH values rejected (exclusiveMinimum: 0)","Missing required old_jth or new_jth fields in either before or after object returns validation error","Extremely large J/TH values (approaching max 10^16) may produce unreliable output","Malformed JSON body returns 400 error","Payment failure or insufficient USDC balance blocks the call (x402 payment required)"],"whenToPreferThis":"Choose this endpoint when you need a structured, sequential (waterfall-style) attribution of efficiency changes between two ASIC J/TH scenarios — specifically when you want to understand which input changes drive the improvement step by step, rather than a simple before/after delta. It is purpose-built for mining hardware efficiency analysis using user-supplied J/TH assumptions, and at $0.01 USDC per call it is cost-effective for one-off or automated reporting workflows.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-19T19:16:36.342Z","isFirstParty":false,"canonicalSlug":"asic-efficiency-improvement-sequential-input-change-attribution-b1641487"}