{"uid":"cap_IMZZupwYVEV-D87QOOGxu","slug":"mining-power-capacity-headroom-named-scenario-comparison-13b96f4a","name":"Mining Power Capacity Headroom — Named Scenario Comparison","description":"Mining power capacity headroom — Named scenario comparison: Named scenario comparison for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded named scenario comparison report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-scenario?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"baseline":{"type":"object","default":{"capacity_kw":100,"committed_kw":70},"required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"scenarios":{"type":"array","items":{"type":"object","required":["label","overrides"],"properties":{"label":{"type":"string","maxLength":80,"minLength":1},"overrides":{"type":"object","properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"minProperties":1,"additionalProperties":false}},"additionalProperties":false},"default":[{"label":"Supplied alternative","overrides":{"capacity_kw":110.00000000000001}}],"maxItems":20,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_N6rjJACr0mYLMQcdKnQYb","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Compares named what-if scenarios for mining power capacity headroom, showing how changes to capacity_kw or committed_kw affect available power headroom.","exampleAgentPrompt":"Compare my mining power headroom across two scenarios: baseline is 100 kW capacity with 70 kW committed, and the alternative scenario is 110 kW capacity — give me a named scenario comparison report showing the headroom difference.","exampleUseCases":[{"title":"Expansion planning for mining farm","prompt":"I'm planning to expand my mining farm. My current setup is 500 kW total capacity with 420 kW committed. Compare that baseline against a scenario where I add 80 kW of capacity — label it 'Expansion Phase 1' — so I can see how much headroom I'd gain."},{"title":"Load reduction scenario analysis","prompt":"My baseline mining operation has 200 kW capacity and 180 kW committed. Run a named comparison with a scenario called 'Load Reduction' where committed drops to 140 kW, so I can see the headroom improvement before I make any changes."},{"title":"Multi-scenario capacity stress test","prompt":"I want to stress-test three named scenarios for my mining rig's power headroom. Baseline is 1000 kW capacity, 850 kW committed. Compare: 'Upgrade A' at 1200 kW capacity, 'Upgrade B' at 1000 kW capacity with 750 kW committed, and 'Worst Case' at 900 kW capacity with 880 kW committed."}],"resultDescription":"A bounded named scenario comparison report showing power capacity headroom (capacity minus committed load) for the baseline and each named scenario, including how overrides affect available headroom, calculated from supplied mining assumptions with formula and units disclosed. No live prices or guaranteed returns are included.","failureModes":["capacity_kw must be greater than 0 (exclusiveMinimum)","committed_kw may exceed capacity_kw resulting in negative headroom (not an error but noteworthy)","scenarios array must have at least 1 item and at most 20 items","each scenario label must be between 1 and 80 characters","each scenario override object must have at least 1 property","payment of 0.01 USDC required per call; missing or failed payment returns 402","malformed JSON body returns 400 validation error"],"whenToPreferThis":"Choose this endpoint when you need to model and compare power headroom outcomes for a mining operation across multiple named what-if configurations simultaneously, rather than computing headroom for a single scenario. Ideal for capacity planning, expansion analysis, or load-shedding decisions where named scenario labels help trace results back to business decisions. Not suitable for live price lookups, profitability forecasts, or general electrical engineering calculations outside of mining power budgeting.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:51.002Z","isFirstParty":false,"canonicalSlug":"mining-power-capacity-headroom-named-scenario-comparison-13b96f4a"}