{"uid":"cap_I239XXlYzgEWuPJHw2T_G","slug":"mining-net-capital-requirement-two-input-scenario-grid-fbe82fe5","name":"Mining Net Capital Requirement — Two-Input Scenario Grid","description":"Mining net capital requirement — Two-input scenario grid: Two-input scenario grid for Mining net capital requirement. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded two-input scenario grid report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-net-capital-stress-grid?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"field_x":{"enum":["hardware_usd","installation_usd","rebates_usd"],"type":"string","default":"hardware_usd"},"field_y":{"enum":["hardware_usd","installation_usd","rebates_usd"],"type":"string","default":"installation_usd"},"baseline":{"type":"object","default":{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},"required":["hardware_usd","installation_usd","rebates_usd"],"properties":{"rebates_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0},"hardware_usd":{"type":"number","default":30000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"installation_usd":{"type":"number","default":5000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"values_x":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[30000,33000],"maxItems":10,"minItems":1},"values_y":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[5000,5500],"maxItems":10,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_nl3twi3xNRIOwGQzIznF8","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a two-dimensional scenario grid showing mining net capital requirements across combinations of hardware cost, installation cost, and rebate values.","exampleAgentPrompt":"Run a two-input scenario grid for mining net capital requirement with hardware_usd on the x-axis at values $25000, $30000, $33000 and installation_usd on the y-axis at $4000, $5000, $6000, using a baseline of hardware $30000, installation $5000, and rebates $1000.","exampleUseCases":[{"title":"Hardware vs installation cost stress test","prompt":"Give me a scenario grid for mining net capital requirement where hardware cost varies across $25000, $28000, $30000, $33000, $36000 on one axis and installation cost varies across $4000, $5000, $6000 on the other, with a baseline of $30000 hardware, $5000 installation, and $1000 in rebates."},{"title":"Rebate sensitivity vs hardware cost grid","prompt":"I want to see how my mining net capital requirement changes across different combinations of hardware cost ($28000, $30000, $32000) and rebate amounts ($500, $1000, $2000, $3000), using baseline hardware $30000, installation $5000, rebates $1000."},{"title":"Pre-purchase capital planning for new mining rigs","prompt":"Before I buy new mining equipment, can you model net capital requirements in a grid with hardware cost on the x-axis at $20000, $25000, $30000 and rebates on the y-axis at $0, $500, $1000, $2000? Baseline is $30000 hardware, $5000 installation, $1000 rebates."}],"resultDescription":"A bounded two-input scenario grid report containing net capital requirement values for every combination of the specified x-axis and y-axis variable values, computed against the supplied mining cost baseline assumptions (hardware, installation, rebates). Formula and units are disclosed in the response. No live prices or guaranteed returns are included.","failureModes":["field_x and field_y set to the same variable — produces a degenerate single-variable grid","values_x or values_y arrays exceed 10 items — rejected by schema validation","baseline hardware_usd set to zero or omitted — schema requires exclusiveMinimum > 0","negative values in values_x or values_y outside the allowed range may cause unexpected output","missing required baseline fields (hardware_usd, installation_usd, rebates_usd) — request rejected","payment failure or insufficient USDC balance — 402 response, no report generated"],"whenToPreferThis":"Choose this endpoint when you need to simultaneously vary two mining cost inputs (hardware, installation, or rebates) and see their joint effect on net capital requirement across a grid of scenarios. Prefer this over a one-input sensitivity table when the interaction between two cost drivers matters. Best suited for capital planning and pre-purchase analysis where combinations of assumptions need to be explored systematically.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:43.545Z","isFirstParty":false,"canonicalSlug":"mining-net-capital-requirement-two-input-scenario-grid-fbe82fe5"}