{"uid":"cap_HqUlUjoWTusWiKsgD2WvN","slug":"mining-energy-consumption-two-input-scenario-grid-ef77896a","name":"Mining Energy Consumption Two-Input Scenario Grid","description":"Mining energy consumption — Two-input scenario grid: Two-input scenario grid for Mining energy consumption. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded two-input scenario grid report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-energy-kwh-stress-grid?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"field_x":{"enum":["power_kw","hours","uptime_percent"],"type":"string","default":"power_kw"},"field_y":{"enum":["power_kw","hours","uptime_percent"],"type":"string","default":"hours"},"baseline":{"type":"object","default":{"hours":24,"power_kw":30,"uptime_percent":90},"required":["power_kw","hours","uptime_percent"],"properties":{"hours":{"type":"number","default":24,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"power_kw":{"type":"number","default":30,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"uptime_percent":{"type":"number","default":90,"maximum":100,"minimum":0}},"additionalProperties":false},"values_x":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[30,33],"maxItems":10,"minItems":1},"values_y":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[24,26.400000000000002],"maxItems":10,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_UkoeFyQcG10NW1K2jB73j","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a two-dimensional grid of mining energy consumption (kWh) scenarios by varying two of three inputs: power draw (kW), operating hours, and uptime percentage.","exampleAgentPrompt":"Run a two-input energy consumption scenario grid for my mining operation with a baseline of 30 kW power, 24 hours, and 90% uptime — vary power_kw across [25, 30, 35] and hours across [20, 22, 24] and show me the full kWh grid.","exampleUseCases":[{"title":"ASIC miner power sensitivity analysis","prompt":"I want a grid showing how total kWh changes as I vary my miner's power draw across 25, 30, 35, and 40 kW against daily operating hours of 20, 22, and 24 — baseline is 30 kW, 24 hours, 90% uptime."},{"title":"Uptime vs hours energy stress test","prompt":"Can you run a two-input scenario grid with uptime_percent on one axis at 70, 80, 90, and 100 percent, and hours on the other at 18, 20, 22, and 24, using a baseline of 30 kW, 24 hours, and 90% uptime? I want to see the full kWh table."},{"title":"Fleet sizing energy planning","prompt":"I'm planning how to size a mining farm and need a kWh scenario grid varying power_kw across 50, 75, 100, and 150 kW with uptime_percent at 80, 90, and 95, keeping baseline at 100 kW power, 24 hours, and 90% uptime."}],"resultDescription":"A bounded two-input scenario grid report containing up to 100 kWh energy consumption values (up to 10 x 10), one for each combination of the two chosen variable inputs, calculated using the formula: kWh = power_kw × hours × (uptime_percent / 100). The report discloses the formula and units used but includes no live pricing, mining difficulty, or return guarantees.","failureModes":["Invalid field_x or field_y value (must be one of power_kw, hours, uptime_percent)","field_x and field_y set to the same variable","values_x or values_y arrays exceed 10 items","Baseline object missing required fields (power_kw, hours, uptime_percent)","Zero or negative values for power_kw or hours (exclusiveMinimum: 0)","uptime_percent out of range (must be 0–100)","Payment failure: insufficient USDC balance for $0.01 call"],"whenToPreferThis":"Choose this endpoint when you need a structured two-dimensional sensitivity table for mining energy consumption across two independently varying parameters. Prefer it over single-scenario calculators when you want to compare multiple operational configurations simultaneously, or when planning/stress-testing mining operations across a range of power, hours, or uptime assumptions. It is not suited for real-time profitability analysis or endpoints that require live hashrate or electricity price inputs.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:18.479Z","isFirstParty":false,"canonicalSlug":"mining-energy-consumption-two-input-scenario-grid-ef77896a"}