{"uid":"cap_HUTtVUot-POsWM0eaz3Ed","slug":"halowerk-buerowerk-meeting-notes-snapshot-compare-0601b46e","name":"HALOWERK buerowerk Meeting Notes Snapshot Compare","description":"HALOWERK buerowerk — bezahlte Endpunkte nach x402. Preise in USDC auf Base Mainnet.","url":"https://buero.halowerk.com/v1/baumarkt/meeting/manufacturing-quality-source-note-register/snapshot-compare?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"baseline":{"type":"object","required":["source","notes"],"properties":{"notes":{"type":"object","required":["summary","topics","decisions","action_items","open_questions"],"properties":{"topics":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30},"summary":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30,"minItems":1},"decisions":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30},"action_items":{"type":"array","items":{"type":"object","required":["text","quote","segment_index","owner","due_raw"],"properties":{"text":{"type":"string","maxLength":1000,"minLength":1},"owner":{"type":["string","null"],"maxLength":80},"quote":{"type":"string","maxLength":3000,"minLength":1},"due_raw":{"type":["string","null"],"maxLength":3000},"segment_index":{"type":"integer","minimum":0}}},"maxItems":30},"open_questions":{"type":"array","items":{"$ref":"#/$defs/ma5dd9d00ff"},"maxItems":30}}},"source":{"type":"object","oneOf":[{"required":["segments"]},{"required":["transcript_package"]}],"required":[],"properties":{"segments":{"$ref":"#/$defs/mbdf0d3bb9b"},"transcript_package":{"$ref":"#/$defs/m81f20e3330"}},"additionalProperties":false}}},"segments":{"$ref":"#/$defs/mbdf0d3bb9b"},"transcript_package":{"$ref":"#/$defs/m81f20e3330"}}},"responseSchema":{"type":"json"},"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_91Oa8vDDVQUKw0yZ6O_f2","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Compares two versions of structured meeting notes (baseline vs. current) to surface changes in summaries, topics, decisions, action items, and open questions.","exampleAgentPrompt":"Compare these two sets of meeting notes for the Q3 manufacturing quality review — here's the baseline version with the original summary, topics, decisions, action items, and open questions, and here's the updated transcript to compare against it. Tell me what changed.","exampleUseCases":[{"title":"Recurring standup note drift detection","prompt":"I have last week's standup notes as the baseline and this week's updated notes. Compare them and tell me which action items were added, which changed owners, and whether any decisions were reversed."},{"title":"Audit trail for contract negotiation meetings","prompt":"We had a meeting on Tuesday and notes were drafted, then edited before final sign-off. Here's the original draft as the baseline and the current version — show me everything that was changed, especially any decisions or open questions that were removed."},{"title":"Track resolution of open questions over time","prompt":"Compare these two snapshots of our product planning meeting notes. I want to know which open questions got resolved between the first and second version, and whether any new action items were added in the process."}],"resultDescription":"A structured JSON response detailing the differences between the baseline meeting notes and the current notes/transcript, including changes to summaries, topics, decisions, action items (owner, due date, text), and open questions — highlighting additions, removals, and modifications.","failureModes":["Missing required baseline fields (summary, topics, decisions, action_items, open_questions) returns a 422 validation error","Neither segments nor transcript_package provided in source returns a schema validation error","Transcript package URL inaccessible or malformed returns a fetch/parse error","Notes arrays exceeding maxItems (30) cause validation rejection","Payment not included or insufficient USDC on Base Mainnet returns HTTP 402","Empty summary array (minItems:1 not met) causes request rejection"],"whenToPreferThis":"Use this endpoint when you need a structured, field-level diff of meeting notes across two snapshots — especially when tracking changes to action items, decisions, or open questions over time in a recurring meeting or editorial workflow. Prefer it over generic document diff tools when the content is meeting-structured data (with owners, due dates, quotes, segment indices) and you need semantic change detection rather than line-by-line text diff.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-14T00:37:07.085Z","isFirstParty":false,"canonicalSlug":"halowerk-buerowerk-meeting-notes-snapshot-compare-a306e033"}