{"uid":"cap_Dr18pW-5byHhqzLv-kfLp","slug":"mining-power-capacity-headroom-distribution-summary-a3abb6b2","name":"Mining Power Capacity Headroom — Distribution Summary","description":"Mining power capacity headroom — Distribution summary: Distribution summary for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded distribution summary report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-summary?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"capacity_kw":100,"committed_kw":70},{"capacity_kw":110.00000000000001,"committed_kw":77},{"capacity_kw":100,"committed_kw":70},{"capacity_kw":110.00000000000001,"committed_kw":77}],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_EpEiLUwcIjzWzQNCTty-t","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes and returns a distribution summary report for mining power capacity headroom across an array of site-level capacity and committed-power observations.","exampleAgentPrompt":"Give me a distribution summary of power capacity headroom for my 4 mining sites — site 1 has 100 kW capacity with 70 kW committed, site 2 has 110 kW capacity with 77 kW committed, site 3 has 200 kW capacity with 120 kW committed, and site 4 has 150 kW capacity with 90 kW committed.","exampleUseCases":[{"title":"Multi-site mining headroom audit","prompt":"I have 5 mining sites and want to see the statistical distribution of spare power headroom — site A is 100 kW capacity / 70 kW committed, site B is 200 kW / 160 kW, site C is 150 kW / 90 kW, site D is 300 kW / 270 kW, site E is 250 kW / 200 kW. Can you summarize the headroom distribution across all of them?"},{"title":"Pre-expansion capacity headroom check","prompt":"Before I add more miners, I want a distribution summary of how much power headroom I have across 3 facilities: facility 1 is 500 kW capacity with 430 kW committed, facility 2 is 800 kW with 600 kW committed, and facility 3 is 300 kW with 280 kW committed."},{"title":"Mining fleet power planning report","prompt":"Can you run a headroom distribution summary across my 6 mining locations? They're: 120 kW / 85 kW, 200 kW / 150 kW, 75 kW / 60 kW, 400 kW / 310 kW, 180 kW / 100 kW, and 250 kW / 210 kW committed. I want to understand how spread out my spare capacity is."}],"resultDescription":"Returns a bounded distribution summary report detailing statistical characteristics of power capacity headroom (capacity_kw minus committed_kw) across all submitted site rows — using supplied mining assumptions, with formula and units disclosed. No live prices or guaranteed returns are included.","failureModes":["Fewer than 2 rows submitted — minimum 2 row items required","capacity_kw is zero or negative — exclusiveMinimum enforces values greater than 0","committed_kw exceeds capacity_kw — may produce negative headroom values, handled by formula","More than 200 rows submitted — maxItems limit exceeded, request rejected","Non-numeric values in capacity_kw or committed_kw — schema validation error","Payment of 0.01 USDC not fulfilled — x402 payment required before processing"],"whenToPreferThis":"Choose this endpoint when you need a statistical distribution summary of power headroom across multiple mining sites (2–200 rows) and want disclosed formulas with supplied assumptions. It is purpose-built for the mining power capacity headroom metric specifically, rather than general statistical distribution tools, and is priced per-report at $0.01 USDC via x402 micropayment.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:55.625Z","isFirstParty":false,"canonicalSlug":"mining-power-capacity-headroom-distribution-summary-a3abb6b2"}