{"uid":"cap_BILz-cGsK7rJYqpanfBU7","slug":"mining-power-capacity-headroom-sequential-input-change-attribution-a8e642ae","name":"Mining Power Capacity Headroom — Sequential Input-Change Attribution","description":"Mining power capacity headroom — Sequential input-change attribution: Sequential input-change attribution for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded sequential input-change attribution report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-waterfall?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"after":{"type":"object","default":{"capacity_kw":110.00000000000001,"committed_kw":77},"required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"before":{"type":"object","default":{"capacity_kw":100,"committed_kw":70},"required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_Z_HRQ-q1-tjpjxD_b06pZ","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Computes a sequential (waterfall) attribution report showing how changes to mining power capacity and committed load inputs affect available headroom.","exampleAgentPrompt":"Run a sequential input-change attribution on my mining power capacity headroom — before I had 100 kW capacity with 70 kW committed, and after I upgraded to 110 kW capacity with 77 kW committed; show me how each change contributed to the headroom shift.","exampleUseCases":[{"title":"Mining facility capacity expansion analysis","prompt":"I just upgraded my mining facility from 100 kW total capacity with 70 kW committed to 110 kW capacity with 77 kW committed — can you run a sequential attribution waterfall to show how much of the headroom change came from the capacity increase versus the higher committed load?"},{"title":"Headroom impact of onboarding new miners","prompt":"Before adding a new batch of miners I had 500 kW capacity and 320 kW committed; after onboarding them it's 500 kW capacity and 410 kW committed — run the sequential input-change attribution on my power headroom so I can see exactly how much headroom I lost."},{"title":"Scenario comparison for capacity planning","prompt":"Compare two mining scenarios for me using a waterfall attribution: scenario A is 2000 kW capacity with 1400 kW committed, scenario B is 2500 kW capacity with 1600 kW committed — break down step by step how each input change drives the difference in available power headroom."}],"resultDescription":"A bounded sequential input-change attribution (waterfall) report that shows, step by step, how each input change (capacity_kw and committed_kw) between the 'before' and 'after' states contributes to the net change in mining power capacity headroom, with formula and units disclosed. No live pricing or guaranteed return data is included.","failureModes":["Invalid or negative capacity_kw (must be > 0)","committed_kw exceeds capacity_kw leading to negative headroom edge cases","Missing required fields in before or after objects","Values exceeding maximum boundary (10^16 kW) rejected","Malformed JSON body returns validation error","Payment not included or insufficient USDC causes 402 response"],"whenToPreferThis":"Choose this endpoint when you need a structured, step-by-step attribution of how individual mining assumption changes (capacity and committed load) drive differences in available power headroom — particularly for waterfall/bridge chart analysis, scenario comparison, or explaining headroom deltas to stakeholders. Prefer this over simple difference calculations when you need the ordered sequential contribution of each input variable isolated and labeled.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-16T18:47:25.359Z","isFirstParty":false,"canonicalSlug":"mining-power-capacity-headroom-sequential-input-change-attribution-a8e642ae"}