{"uid":"cap_ALESzMYAy2kIaYQrLLlcZ","slug":"brainiac-insurance-claim-dispute-letter-drafter-1958dda9","name":"BRAINIAC Insurance Claim Dispute Letter Drafter","description":"Pay-per-call APIs for AI agents: OFAC sanctions screening, compliance checks, token security, and Base chain data via x402. No account. Fixed USDC price. MCP-ready.","url":"https://www.brainiac.software/api/v1/claims/dispute-draft?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"facts":{"type":"string","maxLength":4000,"minLength":1},"amount":{"type":"number","maximum":1000000000000,"minimum":0},"insurer":{"type":"string","maxLength":160,"minLength":2},"purpose":{"enum":["claim","dispute"],"type":"string"},"claimant":{"type":"string","maxLength":160,"minLength":2},"claim_number":{"type":"string","maxLength":80,"minLength":1},"incident_date":{"type":"string","pattern":"^\\d{4}-\\d{2}-\\d{2}$"},"policy_number":{"type":"string","maxLength":80,"minLength":1},"matched_exclusions":{"type":"array","items":{"type":"object","required":["clause","basis"],"properties":{"basis":{"type":"string","maxLength":240,"minLength":3},"clause":{"type":"string","maxLength":400,"minLength":3}},"additionalProperties":false},"maxItems":40},"claim_validity_score":{"type":"number","maximum":100,"minimum":0},"risk_of_denial_percentage":{"type":"number","maximum":100,"minimum":0}}},"responseSchema":{"type":"json","example":{"draft_text":"North Pier Contracting\nHarbor Mutual\nClaims Department\n\nRe: Dispute — claim CLM-100, policy GL-2041\n\nDear Claims Department,\n\nI am North Pier Contracting. This letter disputes the application of a coverage exclusion to the loss described below. Please review the facts against the policy and confirm the claim decision in writing.\n\nPolicy number: GL-2041\nClaim number: CLM-100\nDate of loss: 2026-03-02\nAmount claimed: $12,500.00\n\nFacts:\nRiver flood water entered the warehouse after the storm. A forklift also struck a rack.\n\nCoverage review supplied with this letter:\nValidity score: 75 of 100\nDenial risk: 35 percent\nExclusions matched by that review:\n- flood, surface water, or overflow of any body of water\n\nPlease cite the policy language you rely on if any part of this claim is denied, and list any documents you still need. This draft was prepared from the fields above for human review before it is sent.\n\nSincerely,\nNorth Pier Contracting","completeness_score":100}},"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.04","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.04/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.04","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.04","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_SRGD66Zv886iQ0jynIn0d","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.04","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a formatted insurance claim dispute or initial claim letter from structured claim data, including coverage validity scores and matched exclusions.","exampleAgentPrompt":"Draft an insurance dispute letter for North Pier Contracting disputing claim CLM-100 on policy GL-2041. The incident was a river flood on 2026-03-02 for $12,500. The facts are: river flood water entered the warehouse after a storm and a forklift struck a rack. The coverage review shows a validity score of 75 and 35% denial risk, with one matched exclusion — flood, surface water, or overflow of any body of water. Purpose is dispute.","exampleUseCases":[{"title":"Disputing a denied flood damage claim","prompt":"Write a dispute letter for my client Lakeside Storage LLC to Harbor Mutual for claim CLM-2041 on policy BOP-8872. The loss date was 2025-11-15 and they're claiming $45,000. The facts: heavy rain caused surface water to enter the facility and damaged stored inventory. The insurer cited a flood exclusion. Validity score is 68, denial risk is 55%, matched exclusion is 'surface water or flood from natural causes'. Purpose is dispute."},{"title":"Submitting a new liability claim","prompt":"Draft an initial claim letter for Green Valley Landscaping to Summit Insurance for policy GL-5500. Claim number is CLM-3310, incident date 2025-09-20, amount claimed $8,200. Facts: a crew member accidentally broke a client's fence during routine work. No exclusions matched, validity score is 90, denial risk is 10%. Purpose is claim."},{"title":"Contesting a multi-exclusion denial","prompt":"Generate a dispute letter for Apex Electrical Inc. to Meridian Commercial Insurance, claim MCI-7742 on policy CPP-1190, loss date 2026-01-08, amount $75,000. Facts: a fire started in the electrical panel room during a maintenance job and spread to adjacent offices. The insurer matched two exclusions: 'faulty workmanship' and 'electrical arcing from owned equipment'. Validity score 60, denial risk 70%. Purpose is dispute."}],"resultDescription":"Returns a fully formatted, human-review-ready dispute or claim letter addressed to the insurer's claims department, including all claim details, the narrative facts, coverage validity and denial risk context, matched exclusions, and a request for written justification. Also returns a completeness_score (0–100) indicating how complete the generated letter is based on supplied inputs.","failureModes":["Missing required fields (facts, claimant, insurer, etc.) result in validation errors","purpose enum value not 'claim' or 'dispute' causes rejection","incident_date not matching YYYY-MM-DD pattern returns format error","matched_exclusions array items missing required 'clause' or 'basis' fields cause schema errors","amount exceeding maximum value limit causes rejection","Payment failure via x402 results in 402 response with no letter generated"],"whenToPreferThis":"Use this endpoint when an AI agent needs to produce a professional, formatted insurance claim or dispute letter from structured claim data — especially when matched policy exclusions, claim validity scores, and denial risk percentages are already available from a prior coverage analysis step. Prefer this over generic LLM text generation when you need a structured, compliance-aware letter that explicitly incorporates coverage review metadata and is explicitly marked as a human-review draft before sending.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-11-13T18:41:36.843Z","isFirstParty":false,"canonicalSlug":"brainiac-insurance-claim-dispute-letter-drafter-1958dda9"}