{"uid":"cap_9om10UDTBSYCbebi952j3","slug":"halowerk-energy-dispatch-planner-0423d81c","name":"Halowerk Energy Dispatch Planner","description":"Schedules a deadline-bound compute, DePIN, battery or power-trading workload into an actionable German or European power window. Returns exact timing, expected EUR cost and savings, uncertainty, freshness, expiry and decision trace.","url":"https://energy.halowerk.com/v3/dispatch-plan","method":"POST","headers":{},"bodySchema":null,"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.02","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.02/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.02","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.02","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_JGMh7G17Io2OiMdutsEps","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.02","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Schedules a deadline-bound compute, DePIN, battery, or power-trading workload into an optimal German or European power window, returning exact timing, expected EUR cost and savings, uncertainty, and decision trace.","exampleAgentPrompt":"Find me the cheapest power window in Germany to run a 4 kWh GPU training job that must finish before 11pm tonight — give me the exact start time, expected EUR cost, and how confident you are in the forecast.","exampleUseCases":[{"title":"Cheapest GPU training window today","prompt":"I need to run a 6 kWh deep learning training job on my GPU cluster and it has to be done by midnight tonight — when's the cheapest power window in Germany, what will it cost in EUR, and how much will I save versus running it right now?"},{"title":"DePIN node off-peak scheduling","prompt":"Schedule my DePIN node's power-intensive sync process for the lowest-cost European electricity window before 8am tomorrow — I need the exact start time, the EUR cost estimate, and the uncertainty on that forecast."},{"title":"Battery charge optimization for power trading","prompt":"I want to charge my 10 kWh battery storage unit at the cheapest point on the German spot market today before 5pm — give me the optimal dispatch window, the expected cost in EUR, the savings versus charging now, and the decision reasoning."}],"resultDescription":"Returns an actionable dispatch plan including: the exact recommended start time and duration for the workload, the expected EUR cost, estimated EUR savings versus immediate execution, a forecast uncertainty score, a freshness and expiry timestamp for the plan, and a human-readable decision trace explaining why the window was selected.","failureModes":["No viable dispatch window found before the specified deadline — returns an error or empty plan","Deadline too near for meaningful optimization — endpoint may return a zero-savings plan or warning","Invalid workload type or unsupported region — returns a validation error","Stale market data — freshness timestamp indicates data may be outdated, increasing uncertainty","Payment not settled (x402 micropayment failure) — request is rejected before processing","Excessive demand estimate outside modeled range — returns out-of-bounds error"],"whenToPreferThis":"Use this endpoint when you need to schedule an energy-intensive workload (compute, DePIN, battery charge, or power trade) in Germany or Europe and want an actionable, optimized dispatch window with cost and savings estimates. Prefer this over raw spot-price lookup endpoints when you need a concrete decision (start time, cost, savings) rather than just market data. Best when the workload has a hard deadline and you want the system to reason over the forecast and return a recommended window with uncertainty and trace.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-09-15T06:47:27.876Z","isFirstParty":false}