{"uid":"cap_9i7DxCZHHNgUuED2Ri3zW","slug":"mining-facility-overhead-energy-named-scenario-comparison-e4970040","name":"Mining Facility Overhead Energy — Named Scenario Comparison","description":"Mining facility overhead energy — Named scenario comparison: Named scenario comparison for Mining facility overhead energy. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded named scenario comparison report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-pue-overhead-scenario?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"baseline":{"type":"object","default":{"pue":1.2,"it_kwh":720},"required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"scenarios":{"type":"array","items":{"type":"object","required":["label","overrides"],"properties":{"label":{"type":"string","maxLength":80,"minLength":1},"overrides":{"type":"object","properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"minProperties":1,"additionalProperties":false}},"additionalProperties":false},"default":[{"label":"Supplied alternative","overrides":{"it_kwh":792.0000000000001}}],"maxItems":20,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_x9zkaHEcuYSam7zSlt634","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Compares named scenarios for mining facility overhead energy consumption using PUE (Power Usage Effectiveness) and IT load inputs, returning a bounded scenario comparison report.","exampleAgentPrompt":"Compare two mining facility energy overhead scenarios for me: baseline is a PUE of 1.2 with 720 kWh IT load, and the alternative is a PUE of 1.5 with 792 kWh IT load — label it 'High PUE Config' and show me the overhead comparison report.","exampleUseCases":[{"title":"Cooling upgrade impact assessment","prompt":"I'm thinking about upgrading our mining facility cooling system which would change our PUE from 1.4 down to 1.15. Our current IT load is 5000 kWh. Can you run a named scenario comparison — label the current setup 'Legacy Cooling' and the upgraded one 'New Cooling' — and show me the overhead energy difference?"},{"title":"IT load expansion planning","prompt":"We're planning to double the mining rigs in our facility, which would take our IT kWh from 720 to 1440. PUE stays at 1.2 for both scenarios. Run a named overhead energy comparison with the current setup as baseline and label the expanded scenario 'Double Capacity' so I can see the overhead impact."},{"title":"Multi-scenario PUE benchmarking","prompt":"I want to benchmark three different PUE configurations for our mining operation against a baseline of 1.2 PUE and 2000 kWh IT load. Add scenarios for PUE 1.3 labeled 'Mid Efficiency', PUE 1.5 labeled 'Low Efficiency', and PUE 1.1 labeled 'Best Case' — give me the full overhead energy comparison report."}],"resultDescription":"Returns a bounded named scenario comparison report showing overhead energy figures for each named scenario relative to the baseline, with PUE-adjusted calculations. The report includes per-scenario energy overhead values derived from the supplied PUE and IT kWh inputs using disclosed formulas and units. No live prices, mining yields, or return guarantees are included.","failureModes":["Missing required baseline fields (it_kwh or pue) returns a validation error","PUE value below 1 or above 10 is rejected as out of range","IT kWh of 0 or negative is rejected (exclusiveMinimum enforced)","Scenarios array with 0 items or more than 20 items is rejected","Scenario label exceeding 80 characters is rejected","Scenario overrides object with no properties (minProperties:1 violated) returns error","Payment of less than 0.01 USDC fails to unlock the report"],"whenToPreferThis":"Choose this endpoint when you need to compare multiple named energy overhead scenarios for a mining facility under different PUE and IT load assumptions, and want a structured report with labeled results. It is best suited for what-if analyses and planning exercises where you have specific numeric assumptions and want to see overhead energy differences across named configurations. Not appropriate for live energy pricing, real-time monitoring, or guaranteed return calculations.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T12:39:21.523Z","isFirstParty":false,"canonicalSlug":"mining-facility-overhead-energy-named-scenario-comparison-e4970040"}