{"uid":"cap_9h6F8qr3bUqrNW-KGIi51","slug":"proposal-preparation-string-normalisation-and-numeric-row-ordering-dc245d0b","name":"Proposal Preparation String Normalisation and Numeric Row Ordering","description":"Proposal preparation — String normalisation + Numeric row ordering: String normalisation + Numeric row ordering for supplied proposal preparation records (completed_sections, planned_sections). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-writing-08-025?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["row_id","document_group","date","completed_sections","planned_sections"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"document_group":{"type":"string","default":"","maxLength":80},"planned_sections":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"completed_sections":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","document_group":"group-a","planned_sections":1,"completed_sections":10},{"date":"2026-10-02","row_id":"row-2","document_group":"group-b","planned_sections":2,"completed_sections":20},{"date":"2026-10-03","row_id":"row-3","document_group":"group-a","planned_sections":3,"completed_sections":15},{"date":"2026-10-04","row_id":"row-4","document_group":"group-b","planned_sections":4,"completed_sections":30}],"maxItems":200,"minItems":1},"field":{"enum":["completed_sections","planned_sections"],"type":"string","default":"completed_sections"}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_wSsU3y57a088W5YYfMhcx","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Normalises string fields and orders rows numerically for proposal preparation records containing completed_sections and planned_sections fields, producing two analytical reports for up to 200 rows.","exampleAgentPrompt":"Take my proposal preparation records — rows with row_id, document_group, date, completed_sections and planned_sections — and give me a string normalisation report plus a numeric row ordering report sorted by completed_sections for up to 200 rows.","exampleUseCases":[{"title":"Proposal progress tracking by completion","prompt":"I have 4 proposal rows with document groups A and B, dates from 2026-10-01 to 2026-10-04, and completed_sections values of 10, 20, 15, 30 — can you normalise the strings and rank the rows numerically by completed_sections?"},{"title":"Planned sections ordering for bid team","prompt":"Sort my proposal preparation records by planned_sections and normalise the document group names — I have 50 rows with row IDs, dates, and planned section counts I need ranked for the bid team."},{"title":"Document group comparison across sections","prompt":"Give me a string normalisation and numeric row ordering report for my proposal data using the planned_sections field — I have rows for two document groups spanning October 2026 with planned section counts between 1 and 4."}],"resultDescription":"Two analytical reports: one covering string normalisation of the document_group and related string fields across the supplied rows, and one covering numeric row ordering of the selected field (completed_sections or planned_sections), including ranked/sorted row output. Up to 200 rows processed per call.","failureModes":["More than 200 rows submitted — request rejected with maxItems validation error","Missing required fields (row_id, date, document_group, completed_sections, planned_sections) — validation error","Date not in YYYY-MM-DD format — pattern validation failure","Numeric values outside ±1,000,000,000,000 range — schema validation error","Invalid field enum value (not completed_sections or planned_sections) — rejected","Empty rows array — minItems validation error"],"whenToPreferThis":"Choose this endpoint when you need lightweight, offline string normalisation and numeric row ordering for proposal preparation data specifically containing completed_sections and planned_sections fields, without requiring external lookups, predictions, or live data. It is ideal for batch processing up to 200 proposal records at very low cost ($0.01 USDC for two reports) when no AI generation or external enrichment is needed.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-26T12:31:43.085Z","isFirstParty":false,"canonicalSlug":"proposal-preparation-string-normalisation-and-numeric-row-ordering-dc245d0b"}