{"uid":"cap_9OLMykngqu27AbKoxYD7i","slug":"mesh-budgets-numeric-row-ordering-explicit-missing-value-fill-c53300ab","name":"Mesh Budgets — Numeric Row Ordering + Explicit Missing-Value Fill","description":"Mesh budgets — Numeric row ordering + Explicit missing-value fill: Numeric row ordering + Explicit missing-value fill for supplied mesh budgets records (triangle_count, vertex_count). Up to 200 rows; 2 independent reports using shared local analytical engines. No live lookup, prediction, professional assessment or external action. 0.01 USDC includes 2 supplied-data reports for up to 200 rows.","url":"https://market.datapackvibe.com/x402/assistant-ib26-creative-01-124?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["row_id","asset_group","date","triangle_count","vertex_count"],"properties":{"date":{"type":"string","default":"","pattern":"^\\d{4}-\\d{2}-\\d{2}$","maxLength":10},"row_id":{"type":"string","default":"","maxLength":80,"minLength":1},"asset_group":{"type":"string","default":"","maxLength":80},"vertex_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000},"triangle_count":{"type":["number","null"],"maximum":1000000000000,"minimum":-1000000000000}},"additionalProperties":false},"default":[{"date":"2026-10-01","row_id":"row-1","asset_group":"group-a","vertex_count":1,"triangle_count":10},{"date":"2026-10-02","row_id":"row-2","asset_group":"group-b","vertex_count":2,"triangle_count":20},{"date":"2026-10-03","row_id":"row-3","asset_group":"group-a","vertex_count":3,"triangle_count":15},{"date":"2026-10-04","row_id":"row-4","asset_group":"group-b","vertex_count":4,"triangle_count":30}],"maxItems":200,"minItems":1},"field":{"enum":["triangle_count","vertex_count"],"type":"string","default":"triangle_count"},"method":{"enum":["zero","mean","median"],"type":"string","default":"median"}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_ecWL2CW2DKxB1D259UEOb","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Sorts mesh budget records (triangle_count, vertex_count) numerically by row and fills missing values using zero, mean, or median imputation, returning two analytical reports for up to 200 rows.","exampleAgentPrompt":"I have up to 50 rows of mesh budget data with row_id, asset_group, date, triangle_count, and vertex_count — some vertex_count values are missing. Can you numerically sort the rows by vertex_count and fill the missing values using median imputation?","exampleUseCases":[{"title":"Game asset geometry audit","prompt":"I have 120 rows of game mesh records with triangle_count and vertex_count, but some vertex_count entries are null. Sort all the rows numerically by vertex_count and fill those missing values using median — give me the two reports back."},{"title":"3D pipeline data cleaning","prompt":"My animation pipeline exported mesh budgets for 80 assets across different asset groups and dates, but there are gaps in triangle_count. Can you order the rows numerically by triangle_count and impute the missing ones with zero?"},{"title":"Asset budget compliance review","prompt":"We have 150 mesh budget records from our modeling team and need them sorted by vertex_count with missing values replaced by the mean. Run the numeric ordering and missing-value fill on triangle_count and vertex_count for me."}],"resultDescription":"Two analytical reports covering up to 200 mesh budget rows: one showing records sorted in numeric order by the target field (triangle_count or vertex_count), and one showing records with missing values in that field replaced by the chosen fill method (zero, mean, or median). No live lookups or predictions are included — results are derived purely from the supplied data.","failureModes":["More than 200 rows submitted — request will be rejected or truncated","Invalid date format (not YYYY-MM-DD) causes row validation failure","Missing required fields (row_id, asset_group, date) cause row rejection","Values outside the allowed numeric range (-1e12 to 1e12) trigger validation errors","Empty rows array returns an error","Invalid enum value for method or field causes a bad-request error"],"whenToPreferThis":"Choose this endpoint when you have tabular mesh budget data (triangle_count, vertex_count) that needs both numeric sorting and missing-value imputation in one call, for up to 200 rows. It is purpose-built for 3D asset/geometry data cleaning workflows and returns two reports covering both operations simultaneously at low cost. Prefer it over general-purpose data tools when your data matches the mesh budget schema exactly and you need reproducible, local (non-ML) statistical fills.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-17T12:42:46.751Z","isFirstParty":false,"canonicalSlug":"mesh-budgets-numeric-row-ordering-explicit-missing-value-fill-c53300ab"}