{"uid":"cap_9O7HBwXWMMMar31Cd3xLK","slug":"whole-asics-within-a-power-budget-weighted-result-mean-1bd9dbe9","name":"Whole ASICs within a Power Budget — Weighted Result Mean","description":"Whole ASICs within a power budget — Weighted result mean: Weighted result mean for Whole ASICs within a power budget. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded weighted result mean report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-capacity-units-weighted-mean?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["available_kw","kw_each"],"properties":{"kw_each":{"type":"number","default":3,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"available_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false},"default":[{"kw_each":3,"available_kw":100},{"kw_each":3.3000000000000003,"available_kw":110.00000000000001},{"kw_each":3,"available_kw":100},{"kw_each":3.3000000000000003,"available_kw":110.00000000000001}],"maxItems":200,"minItems":2},"weights":{"type":"array","items":{"type":"number","default":1,"maximum":1000000000000,"minimum":0},"default":[1,2,1,2],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_rfP-oCqpFPnF5fgtn32-A","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates the weighted mean number of whole ASICs that fit within a power budget across multiple scenarios, using user-supplied weights and mining assumptions.","exampleAgentPrompt":"I have four mining scenarios: site A has 100 kW available with 3 kW per ASIC (weight 1), site B has 110 kW with 3.3 kW per ASIC (weight 2), site C has 100 kW with 3 kW per ASIC (weight 1), and site D has 110 kW with 3.3 kW per ASIC (weight 2) — can you compute the weighted mean number of whole ASICs I can run across all those scenarios?","exampleUseCases":[{"title":"Multi-site ASIC fleet capacity planning","prompt":"I'm planning ASIC deployments across three facilities: site 1 has 200 kW available at 5 kW per ASIC and matters twice as much, site 2 has 80 kW at 4 kW per ASIC with weight 1, and site 3 has 150 kW at 6 kW per ASIC with weight 3 — give me the weighted mean number of whole miners I can fit."},{"title":"Comparing power-efficient vs high-draw ASICs","prompt":"I want to compare two ASIC models across my power budget: model X draws 2.5 kW each and I have 90 kW (weight 1), model Y draws 4 kW each and I have 90 kW (weight 2) — what's the weighted mean whole-unit count I should expect?"},{"title":"Budget scenario sensitivity analysis","prompt":"Run a weighted mean ASIC capacity calculation for me: scenario A is 50 kW available at 3 kW per unit with weight 1, scenario B is 75 kW at 3 kW per unit with weight 2, and scenario C is 100 kW at 3 kW per unit with weight 3."}],"resultDescription":"Returns a bounded weighted result mean report showing the weighted average number of whole ASICs that fit within the specified power budgets across all input scenarios, calculated using the supplied weights. The report uses the user-provided assumptions and discloses the formula and units. No live prices or guaranteed returns are included.","failureModes":["Fewer than 2 rows provided — minimum 2 rows required","More than 200 rows provided — maximum 200 rows allowed","kw_each or available_kw is zero or negative — must be strictly positive","Weights array length does not match rows array length — must correspond 1:1","kw_each exceeds maximum allowed value — numerical overflow risk","Payment not provided or insufficient — x402 payment of 0.01 USDC required"],"whenToPreferThis":"Choose this endpoint when you need to aggregate whole-ASIC-per-power-budget calculations across multiple scenarios into a single weighted mean figure, particularly when different sites or configurations should contribute unequally to the result. It is well-suited for fleet planning where scenario importance varies. It is not appropriate for live price lookups, profitability forecasts, or partial-ASIC calculations.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-12T00:51:20.294Z","isFirstParty":false,"canonicalSlug":"whole-asics-within-a-power-budget-weighted-result-mean-1bd9dbe9"}