{"uid":"cap_8XsWzmxf5z-q73kh5SHvM","slug":"project-finance-bankability-scorer-f7a3d2d2","name":"Project Finance Bankability Scorer","description":"Scores the bankability of a project finance structure for infrastructure deals, returning a 0-100 score. Weighs debt service coverage, debt-to-equity leverage, offtake contract quality, construction risk, and sponsor strength; returns grade, recommendation, metrics, and drivers. Use it as a project finance score API, infrastructure finance structure quality check, or DSCR leverage offtake construction-risk calculator.","url":"https://x402.agentutility.ai/project-finance-score","method":"POST","headers":{},"bodySchema":{"$schema":"https://json-schema.org/draft/2020-12/schema","type":"object","properties":{"input":{"type":"object","properties":{"type":{"type":"string","const":"http"},"method":{"type":"string","enum":["POST"]},"bodyType":{"type":"string","enum":["json","form-data","text"]},"body":{"properties":{"dscr":{"type":"number","description":"Debt service coverage ratio, e.g. 1.42."},"debt_to_equity":{"type":"number","description":"Debt/equity ratio, e.g. 2.1."},"offtake_score":{"type":"number","description":"0-100 offtake contract and counterparty quality."},"construction_risk_score":{"type":"number","description":"0-100 construction risk; higher means riskier. Default 40."},"sponsor_strength":{"type":"number","description":"0-100 sponsor execution and balance-sheet strength. Default 70."}},"required":["dscr","debt_to_equity","offtake_score"]}},"required":["type","method","bodyType","body"],"additionalProperties":false},"output":{"type":"object","properties":{"type":{"type":"string"},"example":{"type":"object","properties":{"calculator":{"type":"string"},"score":{"type":"number"},"grade":{"type":"string"},"recommendation":{"type":"string"},"metrics":{"type":"object","properties":{"dscr":{"type":"number"},"debt_to_equity":{"type":"number"}}},"drivers":{"type":"array","items":{"type":"object","properties":{"name":{"type":"string"},"score":{"type":"number"},"weight":{"type":"number"},"note":{"type":"string"}}}},"warnings":{"type":"array"},"source":{"type":"string"}}}},"required":["type"]}},"required":["input"]},"responseSchema":{"type":"json","example":{"grade":"strong","score":74.2,"source":"deterministic in-process finance calculator; no upstream API","drivers":[{"name":"debt_service_coverage","note":"1.42x DSCR","score":83.6,"weight":0.3}],"metrics":{"dscr":1.42,"debt_to_equity":2.1},"warnings":[],"calculator":"project-finance-score","recommendation":"Proceed with standard diligence and covenant checks."}},"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"registry","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_Uam1uzrpF1zuqATQw-brg","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":null,"unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Scores the bankability of a project finance structure for infrastructure deals on a 0-100 scale, analyzing DSCR, leverage, offtake contract quality, construction risk, and sponsor strength.","exampleAgentPrompt":"Can you score the bankability of this infrastructure deal — it's a 25-year wind farm with a DSCR of 1.35x, 70/30 debt-to-equity, a 20-year utility offtake contract rated BBB, moderate construction risk with a fixed-price EPC contract, and an investment-grade sponsor?","exampleUseCases":[{"title":"Pre-screening a renewable energy deal","prompt":"I'm evaluating a solar project finance structure — 1.4x DSCR, 65/35 leverage, a 15-year PPA with an A-rated utility, low construction risk with a wrapped EPC, and a tier-1 developer sponsor. Can you run a bankability score so I know if it's worth sending to lenders?"},{"title":"Stress-testing a toll road PPP structure","prompt":"We have a toll road PPP with a 1.20x DSCR, 75/25 debt-to-equity, no offtake contract (merchant revenue), high construction complexity, and a mid-market sponsor — what bankability score does this structure get and what are the main risk drivers dragging it down?"},{"title":"Comparing two LNG terminal structures","prompt":"I need to compare two LNG terminal project finance structures. The first has 1.5x DSCR, 60/40 leverage, a 20-year take-or-pay offtake rated A, low construction risk, and a major oil company sponsor. The second has 1.25x DSCR, 75/25 leverage, a 10-year contract rated BBB-, medium construction risk, and a smaller independent sponsor. Can you score both and tell me which is more bankable?"}],"resultDescription":"Returns a 0-100 bankability score, a letter grade, a lender recommendation (e.g. 'bankable', 'conditional', 'not bankable'), quantified financial metrics (DSCR, leverage), and a list of key risk drivers and strengths influencing the score.","failureModes":["Missing required financial inputs (DSCR, leverage ratio) returns a 400 validation error","Malformed or out-of-range parameter values (e.g. negative DSCR) may return a 422 error","Payment failure via x402 protocol returns a 402 Payment Required response","Service unavailability returns a 503 or timeout"],"whenToPreferThis":"Use this endpoint when an AI agent needs a structured, quantitative bankability verdict on an infrastructure or project finance deal — especially when assessing whether a capital structure can attract senior debt. Prefer this over generic financial scoring tools when the deal involves DSCR analysis, offtake contracts, EPC construction risk, or project sponsor evaluation typical of PPP, energy, or infrastructure transactions.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-09-14T07:04:50.788Z","isFirstParty":false}