{"uid":"cap_4pTSzq8vwlFSNMvptGKFb","slug":"mining-net-capital-requirement-before-and-after-comparison-0a7a3e62","name":"Mining Net Capital Requirement — Before and After Comparison","description":"Mining net capital requirement — Before and after comparison: Before and after comparison for Mining net capital requirement. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded before and after comparison report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-net-capital-compare?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"after":{"type":"object","default":{"rebates_usd":1100,"hardware_usd":33000,"installation_usd":5500},"required":["hardware_usd","installation_usd","rebates_usd"],"properties":{"rebates_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0},"hardware_usd":{"type":"number","default":30000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"installation_usd":{"type":"number","default":5000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"before":{"type":"object","default":{"rebates_usd":1000,"hardware_usd":30000,"installation_usd":5000},"required":["hardware_usd","installation_usd","rebates_usd"],"properties":{"rebates_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0},"hardware_usd":{"type":"number","default":30000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"installation_usd":{"type":"number","default":5000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_HmJeggpQB_-c69QeUcOnM","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Compares two sets of mining capital assumptions (before and after) to produce a bounded net capital requirement report showing the change.","exampleAgentPrompt":"Compare my mining net capital requirement before and after a hardware upgrade: before I had $30,000 hardware, $5,000 installation, and $1,000 in rebates; after it's $33,000 hardware, $5,500 installation, and $1,100 in rebates — give me the before-and-after report.","exampleUseCases":[{"title":"Hardware upgrade capital impact assessment","prompt":"I'm upgrading my mining rigs and want to see the net capital requirement change: before the upgrade my hardware was $50,000, installation $8,000, rebates $2,000 — after it'll be $75,000 hardware, $10,000 installation, and $3,500 in rebates. Show me the before and after comparison."},{"title":"Rebate negotiation scenario planning","prompt":"My supplier just offered better rebates — can you compare my mining net capital requirement before ($30,000 hardware, $5,000 installation, $500 rebates) and after ($30,000 hardware, $5,000 installation, $4,000 rebates) to see how much capital I save?"},{"title":"Installation cost overrun analysis","prompt":"Our mining installation came in over budget — run a before-and-after capital comparison using $40,000 hardware, $6,000 installation, $1,200 rebates as the original plan and $40,000 hardware, $9,500 installation, $1,200 rebates as the actual outcome."}],"resultDescription":"Returns a structured before-and-after comparison report of the mining net capital requirement, showing computed values for both the 'before' and 'after' scenarios based on supplied hardware, installation, and rebate inputs, along with the delta between them. No live prices or guaranteed returns are included — the result is bounded to the single comparison report.","failureModes":["Missing required fields (hardware_usd, installation_usd, or rebates_usd in either before or after object) returns a validation error","hardware_usd set to zero triggers exclusiveMinimum constraint failure","Values exceeding the maximum threshold (1e16) cause schema validation rejection","Malformed JSON body returns a 400-level error","Payment of 0.01 USDC not supplied or x402 payment failure prevents report generation"],"whenToPreferThis":"Choose this endpoint when you need a bounded, single-call before-and-after comparison of mining net capital requirements driven entirely by user-supplied cost assumptions (hardware, installation, rebates). It is ideal for scenario planning and sensitivity analysis where the user already knows both sets of inputs and wants a structured delta report. Prefer this over a single-calculation endpoint when the comparison of two states is the primary goal, and over live-price or return-guarantee tools when only formula-based capital computation is needed.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:47:50.898Z","isFirstParty":false,"canonicalSlug":"mining-net-capital-requirement-before-and-after-comparison-0a7a3e62"}