{"uid":"cap_4nF0hO7rfZ-ozgfEeBOP4","slug":"zero-plan-cost-zack-2ab-workers-dev-create-change-order-with-pdf-c628c3bf","name":"Create Change Order with PDF Render and Email Dispatch","description":"Create a change order on an existing project, render PDF, return email-dispatch payload.","url":"https://zero-plan-cost.zack-2ab.workers.dev/v1/change-orders?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object"},"responseSchema":{"type":"object"},"example":null,"exampleRequest":null,"tags":[],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"settled","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"mpp","network":"tempo","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"mpp","network":"tempo","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_6eUFtjobsusA9dr88mhIx","protocol":"mpp","methodType":"crypto","chain":"tempo","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x20C000000000000000000000b9537d11c60E8b50","unit":"request","depositMicros":null,"planRef":null}],"brandName":"zero-plan-cost.zack-2ab.workers.dev","brandSlug":"zero-plan-cost-zack-2ab-workers-dev-mpp","brandBaseUrl":"https://zero-plan-cost.zack-2ab.workers.dev","brandDocsUrl":null,"whatItDoes":"Creates a change order on an existing project, renders it as a PDF, and returns an email-dispatch payload ready to send.","exampleAgentPrompt":"Create a change order on project ID proj_abc123 for an additional $4,200 in electrical work due to scope expansion — render it as a PDF and give me the email payload so I can send it to the client.","exampleUseCases":null,"resultDescription":"Returns a JSON object containing the newly created change order record, a rendered PDF (or link to it), and a ready-to-send email dispatch payload including recipient, subject, and body or attachment reference.","failureModes":["Project ID not found — returns error indicating no matching project","Invalid or missing change order fields — returns validation error","PDF rendering failure — returns error if document generation fails","Downstream email payload generation error — returns partial or error response","Payment/auth failure — returns 402 or 401 if credentials are missing or insufficient"],"whenToPreferThis":"Use this endpoint when you need to formally document scope or cost changes to an existing project, generate a client-ready PDF, and prepare the email notification in a single atomic call — especially in construction or contracting workflows where change orders must be documented and communicated.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-25T06:39:56.376Z","isFirstParty":false,"canonicalSlug":"zero-plan-cost-zack-2ab-workers-dev-create-change-order-with-pdf-c628c3bf"}