{"uid":"cap_3SEX10vEXkW4Vz5bbI912","slug":"mining-operating-cash-contribution-batch-calculation-0303ecce","name":"Mining Operating Cash Contribution — Batch Calculation","description":"Mining operating cash contribution — Batch calculation: Batch calculation for Mining operating cash contribution. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded batch calculation report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-cash-margin-batch?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["revenue_usd","electricity_usd","maintenance_usd","other_usd"],"properties":{"other_usd":{"type":"number","default":5,"maximum":10000000000000000,"minimum":0},"revenue_usd":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"electricity_usd":{"type":"number","default":60,"maximum":10000000000000000,"minimum":0},"maintenance_usd":{"type":"number","default":10,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"other_usd":5,"revenue_usd":100,"electricity_usd":60,"maintenance_usd":10},{"other_usd":5.5,"revenue_usd":110.00000000000001,"electricity_usd":66,"maintenance_usd":11}],"maxItems":200,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_g-ZXNPXs-LC0nesRsXVjF","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates operating cash contribution (revenue minus electricity, maintenance, and other costs) for up to 200 mining operations in a single batch call.","exampleAgentPrompt":"Can you run a batch mining cash contribution calculation for three operations: one with $100 revenue, $60 electricity, $10 maintenance, and $5 other costs; one with $200 revenue, $120 electricity, $20 maintenance, and $8 other costs; and one with $150 revenue, $90 electricity, $15 maintenance, and $6 other costs?","exampleUseCases":[{"title":"Multi-rig fleet profitability snapshot","prompt":"I have 10 mining rigs with different cost structures — can you batch-calculate the operating cash contribution for each? Rig 1: $500 revenue, $300 electricity, $50 maintenance, $20 other. Rig 2: $620 revenue, $380 electricity, $60 maintenance, $25 other. Rig 3: $450 revenue, $270 electricity, $45 maintenance, $18 other. And so on for the rest with similar proportions scaled up by 10% each."},{"title":"Scenario comparison for mining site expansion","prompt":"We're evaluating three expansion scenarios for our mining site. Scenario A: $10,000 revenue, $6,000 electricity, $800 maintenance, $200 other. Scenario B: $15,000 revenue, $9,500 electricity, $1,000 maintenance, $300 other. Scenario C: $20,000 revenue, $13,000 electricity, $1,200 maintenance, $400 other. Can you batch-calculate the operating cash contribution for each so we can compare them?"},{"title":"Monthly cost-structure sensitivity analysis","prompt":"I want to stress-test my mining operation's cash contribution under different electricity cost assumptions. Run a batch for five rows: base case $200 revenue with electricity at $80, $100, $120, $140, and $160 respectively, all with $15 maintenance and $5 other costs."}],"resultDescription":"A bounded batch calculation report containing the operating cash contribution for each submitted row, computed as revenue minus electricity, maintenance, and other costs, covering up to 200 input rows per call.","failureModes":["Empty rows array or missing required fields (revenue_usd, electricity_usd, maintenance_usd, other_usd) returns validation error","More than 200 rows submitted exceeds maxItems limit and is rejected","revenue_usd of exactly 0 violates exclusiveMinimum and is rejected","Non-numeric values in cost fields cause schema validation failure","Payment not fulfilled via x402 protocol returns 402 Payment Required"],"whenToPreferThis":"Choose this endpoint when you need to evaluate operating cash contribution across multiple mining scenarios or rigs simultaneously, rather than calling a single-row endpoint repeatedly. It is particularly suited for financial modeling, fleet analysis, and scenario comparison where up to 200 rows of mining cost assumptions need to be processed in one call. It uses supplied assumptions only with no live price feeds, making it deterministic and reproducible.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:47:41.924Z","isFirstParty":false,"canonicalSlug":"mining-operating-cash-contribution-batch-calculation-0303ecce"}