{"uid":"cap_1vlNMUd6hG0J5by56F_um","slug":"mining-facility-overhead-energy-target-gap-calculation-0aebc49d","name":"Mining Facility Overhead Energy — Target Gap Calculation","description":"Mining facility overhead energy — Target gap calculation: Target gap calculation for Mining facility overhead energy. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded target gap calculation report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-pue-overhead-target-gap?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"target":{"type":"number","default":100,"maximum":1000000000000000000,"minimum":-1000000000000000000},"values":{"type":"object","default":{"pue":1.2,"it_kwh":720},"required":["it_kwh","pue"],"properties":{"pue":{"type":"number","default":1.2,"maximum":10,"minimum":1},"it_kwh":{"type":"number","default":720,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0}},"additionalProperties":false}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_K-qbu9Lv2eqUhqKScbapl","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Calculates the gap between a target value and the computed overhead energy for a mining facility given PUE and IT energy consumption inputs.","exampleAgentPrompt":"Calculate the overhead energy target gap for my mining facility — my PUE is 1.35, IT energy consumption is 850 kWh, and my overhead energy target is 300 kWh.","exampleUseCases":[{"title":"Efficiency audit for mining farm","prompt":"My mining farm runs at a PUE of 1.4 with 1200 kWh of IT load per month. My overhead energy target is 480 kWh — can you calculate how far off I am from that target?"},{"title":"PUE optimization planning","prompt":"I'm trying to get my mining facility overhead energy down to 200 kWh. Right now my PUE is 1.25 and IT consumption is 720 kWh — what's the gap between where I am and that target?"},{"title":"Energy compliance reporting","prompt":"For our quarterly compliance report, I need the overhead energy target gap for our mining operation: PUE is 1.2, IT load is 960 kWh, and the board-approved overhead target is 192 kWh."}],"resultDescription":"A bounded target gap calculation report showing the numeric difference between the supplied target overhead energy value and the computed overhead energy derived from the provided PUE and IT kWh inputs, based on the disclosed formula. No live pricing, mining rewards, or investment returns are included.","failureModes":["PUE value outside valid range (must be between 1 and 10) returns validation error","IT kWh must be greater than 0 — zero or negative values rejected","Target value outside the allowable numeric bounds returns an error","Malformed or missing required fields (pue, it_kwh) result in a 400-level error","Service unavailability returns a non-200 response with no report"],"whenToPreferThis":"Use this endpoint when you need a fast, cheap ($0.01 USDC) computation of the gap between a desired overhead energy target and the actual overhead energy implied by a given PUE and IT load for a mining facility. Prefer this over manual calculation when integrating into an automated energy monitoring or compliance workflow, or when you need a structured report output rather than a raw formula result.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:09.930Z","isFirstParty":false,"canonicalSlug":"mining-facility-overhead-energy-target-gap-calculation-0aebc49d"}