{"uid":"cap_0cwutqyvhJlNiaSgKtlYR","slug":"mining-power-capacity-headroom-two-input-scenario-grid-f36988bb","name":"Mining Power Capacity Headroom — Two-Input Scenario Grid","description":"Mining power capacity headroom — Two-input scenario grid: Two-input scenario grid for Mining power capacity headroom. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded two-input scenario grid report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-power-headroom-stress-grid?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"field_x":{"enum":["capacity_kw","committed_kw"],"type":"string","default":"capacity_kw"},"field_y":{"enum":["capacity_kw","committed_kw"],"type":"string","default":"committed_kw"},"baseline":{"type":"object","default":{"capacity_kw":100,"committed_kw":70},"required":["capacity_kw","committed_kw"],"properties":{"capacity_kw":{"type":"number","default":100,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"committed_kw":{"type":"number","default":70,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"values_x":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[100,110.00000000000001],"maxItems":10,"minItems":1},"values_y":{"type":"array","items":{"type":"number","default":1,"maximum":10000000000000000,"minimum":-10000000000000000},"default":[70,77],"maxItems":10,"minItems":1}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm_ovlj1aUgydOtFONfbpDq0","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Generates a two-input scenario grid report showing headroom between mining power capacity and committed power draw across user-specified value ranges.","exampleAgentPrompt":"Run a two-input power headroom scenario grid for my mining operation with a baseline of 100 kW capacity and 70 kW committed — vary capacity across [100, 120, 140] kW on the X axis and committed load across [60, 70, 80] kW on the Y axis, and show me the headroom at each combination.","exampleUseCases":[{"title":"Mining facility capacity expansion planning","prompt":"I'm planning to expand my mining facility and want to see how power headroom changes — set a baseline of 500 kW capacity and 350 kW committed, then run a scenario grid varying capacity across [500, 600, 700, 800] kW on X and committed load across [300, 350, 400, 450] kW on Y so I can see the headroom at every combination."},{"title":"Stress testing committed load against fixed capacity","prompt":"My mining site has a fixed capacity of 200 kW and I need to know how much headroom I'd have if committed draw goes up — keep capacity fixed at 200 kW on X and sweep committed_kw across [140, 160, 180, 195, 200] kW on Y using a baseline of 200 capacity and 140 committed."},{"title":"Small-scale miner headroom sensitivity check","prompt":"Can you run a quick power headroom grid for a small mining setup? Baseline is 50 kW capacity and 35 kW committed — vary capacity on X across [50, 60, 70] and committed on Y across [30, 35, 40, 45] and tell me the headroom at each scenario point."}],"resultDescription":"A bounded two-input scenario grid report showing computed power headroom values (capacity_kw minus committed_kw) at every combination of the specified X and Y axis values, based on user-supplied mining assumptions. The report uses the endpoint's disclosed formula and kW units, with no live pricing or guaranteed return figures included.","failureModes":["Invalid field_x/field_y enum values (not 'capacity_kw' or 'committed_kw') result in validation error","values_x or values_y arrays exceeding 10 items are rejected","capacity_kw baseline of zero or negative is rejected (exclusiveMinimum:0)","Both field_x and field_y set to the same variable may produce a degenerate grid","Extremely large kW values (approaching 1e16) may produce overflow or nonsensical headroom results","Payment failure in x402 protocol prevents report generation"],"whenToPreferThis":"Choose this endpoint when you need to explore how mining power headroom varies across two power parameters simultaneously — specifically capacity_kw and committed_kw — in a structured grid format. It is ideal for scenario planning, sensitivity analysis, and stress-testing power assumptions in a mining context without requiring live price feeds. Prefer it over single-point calculators when you need a matrix of outcomes across multiple input combinations.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-16T18:47:28.566Z","isFirstParty":false,"canonicalSlug":"mining-power-capacity-headroom-two-input-scenario-grid-f36988bb"}