{"uid":"cap_0LbWuNR2L3RbvUpfMmmkH","slug":"mining-hardware-purchase-budget-ordered-trend-analysis-7b9f0f6f","name":"Mining Hardware Purchase Budget — Ordered Trend Analysis","description":"Mining hardware purchase budget — Ordered trend analysis: Ordered trend analysis for Mining hardware purchase budget. Supplied mining assumptions only; formula and units disclosed. No live prices, mining or guaranteed return. Specialised preset in a shared 50-profile, 20-operation engine. 0.01 USDC includes one bounded ordered trend analysis report.","url":"https://market.datapackvibe.com/x402/assistant-bx-mining-fleet-purchase-trend?utm_source=zero.xyz","method":"POST","headers":{},"bodySchema":{"type":"object","properties":{"rows":{"type":"array","items":{"type":"object","required":["units","unit_usd","shipping_usd"],"properties":{"units":{"type":"number","default":10,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"unit_usd":{"type":"number","default":3000,"maximum":10000000000000000,"minimum":0,"exclusiveMinimum":0},"shipping_usd":{"type":"number","default":1000,"maximum":10000000000000000,"minimum":0}},"additionalProperties":false},"default":[{"units":10,"unit_usd":3000,"shipping_usd":1000},{"units":11,"unit_usd":3300.0000000000005,"shipping_usd":1100},{"units":10,"unit_usd":3000,"shipping_usd":1000},{"units":11,"unit_usd":3300.0000000000005,"shipping_usd":1100}],"maxItems":200,"minItems":2}}},"responseSchema":null,"example":null,"exampleRequest":null,"tags":["x402"],"displayCostAmount":"0.01","displayCostAsset":"USDC","priceDynamic":false,"priceHint":null,"priceStatus":"priced","priceSource":"probe","requiresHandshake":false,"reviewCount":0,"rating":{"score":"0.00","successRate":"0.00","reviews":0,"stars":null,"state":"unrated"},"availabilityStatus":"unknown","priceObserved":null,"sessionDeposit":null,"pricing":{"kind":"static","summary":"$0.01/call","primary":{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"},"accepted":[{"kind":"static","protocol":"x402","network":"base","amountUsd":"0.01","per":"call","confidence":"exact"}]},"paymentMethods":[{"uid":"pm__PYrgoKQrmSVNKBS28Tys","protocol":"x402","methodType":"crypto","chain":"base","mode":"charge","costAmount":"0.01","costPer":"request","priority":0,"asset":"0x833589fCD6eDb6E08f4c7C32D4f71b54bdA02913","unit":"request","depositMicros":null,"planRef":null}],"brandName":null,"brandSlug":null,"brandBaseUrl":null,"brandDocsUrl":null,"whatItDoes":"Analyzes ordered trend patterns in mining hardware purchase budgets across multiple row entries, computing totals and trend metrics from units, unit prices, and shipping costs.","exampleAgentPrompt":"Can you run an ordered trend analysis on my mining hardware purchases? I have 4 orders: 10 units at $3,000 each with $1,000 shipping, then 11 units at $3,300 each with $1,100 shipping, then 10 units at $3,000 each with $1,000 shipping, then 11 units at $3,300 each with $1,100 shipping.","exampleUseCases":[{"title":"Fleet scale-up budget trend check","prompt":"I'm scaling up my ASIC mining fleet across 5 purchase rounds — can you run an ordered trend analysis on these buys? Round 1: 20 units at $2,800 each, $900 shipping. Round 2: 25 units at $2,950 each, $1,050 shipping. Round 3: 30 units at $3,100 each, $1,200 shipping. Round 4: 35 units at $3,250 each, $1,350 shipping. Round 5: 40 units at $3,400 each, $1,500 shipping."},{"title":"Volatile pricing trend assessment","prompt":"My hardware supplier prices have been all over the place — can you do an ordered trend analysis across these 4 procurement batches to see if costs are actually rising? Batch A: 15 units at $4,000, $800 shipping. Batch B: 12 units at $3,600, $700 shipping. Batch C: 18 units at $4,200, $900 shipping. Batch D: 10 units at $3,800, $750 shipping."},{"title":"Small pilot purchase trend review","prompt":"We did a small pilot mining hardware rollout in three stages and I want to see the budget trend — can you analyze it? Stage 1: 5 units at $2,500, $500 shipping. Stage 2: 7 units at $2,700, $600 shipping. Stage 3: 6 units at $2,600, $550 shipping."}],"resultDescription":"Returns a bounded ordered trend analysis report covering the submitted mining hardware purchase rows, including computed budget totals, trend direction, and trend metrics derived from units, unit prices, and shipping costs. No live market prices or guaranteed returns are included; the analysis is based solely on supplied assumptions using disclosed formulas and units.","failureModes":["Fewer than 2 rows submitted — minimum of 2 rows required","Row missing required fields (units, unit_usd, or shipping_usd) — validation error","units or unit_usd submitted as zero or negative — exclusiveMinimum violation","More than 200 rows submitted — exceeds maxItems limit","Payment not processed — x402 payment required at $0.01 USDC per call","Extremely large numeric values may hit maximum boundary constraints"],"whenToPreferThis":"Choose this endpoint when you need a structured, ordered trend analysis of mining hardware procurement budgets across multiple purchase rounds, using your own supplied cost assumptions (units, unit price, shipping). It is purpose-built for mining fleet capital expenditure trend reporting and not for live price lookups, mining profitability forecasting, or general financial modeling. Best used when you have 2–200 discrete procurement rows and want a quick, inexpensive ($0.01 USDC) trend summary without needing to build your own formula.","instructions":null,"reviewSummary":null,"reviewSummaryHighlights":null,"reviewSummaryConcerns":null,"reviewSummaryGeneratedAt":null,"activationCount":0,"lastUsedAt":null,"lastSuccessfullyRanAt":null,"lastHealthCheckAt":"2026-10-15T18:48:01.363Z","isFirstParty":false,"canonicalSlug":"mining-hardware-purchase-budget-ordered-trend-analysis-7b9f0f6f"}